<v Speaker 2>Welcome to Digitalization Tech Talks, the
podcast focused on addressing common

3
00:00:11.340 --> 00:00:16.299
<v Speaker 2>issues in the process industries and how
they can be, and actually in many cases are

4
00:00:16.299 --> 00:00:20.319
<v Speaker 2>already being addressed with the use of
new and emerging technologies.

5
00:00:20.700 --> 00:00:24.500
<v Speaker 2>Our goal is to provide you with ideas that
may be helpful to you as part of your own

6
00:00:24.500 --> 00:00:25.819
<v Speaker 2>digital transformation.

7
00:00:26.629 --> 00:00:29.979
<v Speaker 2>Today we're bringing two exciting firsts
to the series.

8
00:00:30.549 --> 00:00:32.709
<v Speaker 2>Number 1 is that we're gonna talk about
beer.

9
00:00:32.990 --> 00:00:34.090
<v Speaker 2>More on that soon.

10
00:00:34.630 --> 00:00:38.459
<v Speaker 2>And the second is that this is Cole
Lewis's first time in the co-host seat.

11
00:00:38.869 --> 00:00:41.189
<v Speaker 2>Sounds like the perfect combination for a
toast.

12
00:00:41.959 --> 00:00:46.479
<v Speaker 2>This episode's topic pertains to the
transition from paper to digital at a global

13
00:00:46.479 --> 00:00:50.860
<v Speaker 2>brewery, which is a very desirable move
across the process industries.

14
00:00:51.400 --> 00:00:54.020
<v Speaker 2>Before we bring in our guest, I'd like to
welcome Cole to the show.

15
00:00:54.439 --> 00:00:56.630
<v Speaker 2>Hello, Cole, it's great to have you on
board.

16
00:00:56.959 --> 00:00:59.540
<v Speaker 2>What are your thoughts on beer and today's
topic?

17
00:01:00.080 --> 00:01:00.520
<v Cole Lewis>Thanks, Don.

18
00:01:00.709 --> 00:01:04.360
<v Cole Lewis>Yeah, no, it's great to be here and really
not a bad way to start as a co-host.

19
00:01:04.680 --> 00:01:06.819
<v Cole Lewis>Getting to talk about digitalization and
beer.

20
00:01:07.379 --> 00:01:10.750
<v Cole Lewis>These are two exciting topics on their
own, so I think it should be a really fun

21
00:01:10.750 --> 00:01:11.290
<v Cole Lewis>conversation today.

22
00:01:11.470 --> 00:01:14.769
<v Cole Lewis>But yeah, on the surface, moving from
paper to digital, I feel like it might sound

23
00:01:14.769 --> 00:01:16.639
<v Cole Lewis>simple, but it's actually a pretty big
shift.

24
00:01:17.300 --> 00:01:20.419
<v Cole Lewis>In April, I was at the Craft Brewers
conference and talked to a lot of breweries who

25
00:01:20.419 --> 00:01:22.839
<v Cole Lewis>are trying to work through this exact same
challenge.

26
00:01:23.529 --> 00:01:26.730
<v Cole Lewis>So it's not really as easy as it seems for
brewers or really anyone in the process

27
00:01:26.730 --> 00:01:27.400
<v Cole Lewis>industries.

28
00:01:27.889 --> 00:01:31.129
<v Cole Lewis>But yeah, I'm looking forward to hearing
how our guest approaches this, what our

29
00:01:31.129 --> 00:01:32.430
<v Cole Lewis>listeners can take away from it.

30
00:01:32.849 --> 00:01:33.440
<v Speaker 2>Well, thanks, Cohen.

31
00:01:33.529 --> 00:01:34.529
<v Speaker 2>Welcome again to the show.

32
00:01:34.690 --> 00:01:35.750
<v Speaker 2>Great to have you on board.

33
00:01:35.769 --> 00:01:39.610
<v Speaker 2>And this is a challenge for sure, what our
guest has accomplished and we'll learn

34
00:01:39.610 --> 00:01:40.470
<v Speaker 2>more about that.

35
00:01:40.889 --> 00:01:43.139
<v Speaker 2>And I think we're gonna have a lot of
questions for him as well.

36
00:01:43.300 --> 00:01:44.660
<v Speaker 2>So why don't we go ahead and bring him on?

37
00:01:45.220 --> 00:01:48.680
<v Speaker 2>Fred Husman is a senior program manager at
Sky IO.

38
00:01:49.300 --> 00:01:54.220
<v Speaker 2>Fred has more than 35 years of experience
working on automation projects in the

39
00:01:54.220 --> 00:01:57.040
<v Speaker 2>process industries, and we're gonna talk
about one of those today.

40
00:01:57.699 --> 00:01:58.540
<v Speaker 2>Hello, Fred.

41
00:01:58.660 --> 00:02:00.849
<v Speaker 2>Welcome to Digitalization Tech Talks.

42
00:02:01.180 --> 00:02:05.300
<v Speaker 2>Can you tell us about your background in
manufacturing digitalization and briefly

43
00:02:05.300 --> 00:02:07.089
<v Speaker 2>introduce the project we're gonna discuss
today?

44
00:02:07.300 --> 00:02:07.459
<v Speaker 2>Yes,

45
00:02:07.620 --> 00:02:08.850
<v Fred Husman>Don, thanks for having me.

46
00:02:09.179 --> 00:02:13.339
<v Fred Husman>Like you said, I have been working in the
automation of process plants in the OT

47
00:02:13.339 --> 00:02:18.779
<v Fred Husman>space for 35 years now, but recently I
have begun supporting the IT OT integration

48
00:02:19.500 --> 00:02:20.539
<v Fred Husman>necessary to go digital.

49
00:02:21.320 --> 00:02:25.860
<v Fred Husman>Now, to go digital, companies in the
process industries need a unified name space

50
00:02:25.960 --> 00:02:28.759
<v Fred Husman>that contains all the data of their entire
enterprise.

51
00:02:28.880 --> 00:02:30.830
<v Fred Husman>They call it the one source of truth.

52
00:02:31.360 --> 00:02:35.339
<v Fred Husman>So the first step is harvesting
manufacturing data from the automation system.

53
00:02:35.580 --> 00:02:41.339
<v Fred Husman>In the end, you want a database that
contains all your historical and real-time

54
00:02:41.339 --> 00:02:44.080
<v Fred Husman>information so that you can unleash AI on
it.

55
00:02:44.520 --> 00:02:48.449
<v Fred Husman>Most of our customers in the processing
industries are at step one.

56
00:02:48.770 --> 00:02:53.470
<v Fred Husman>SCIO is working with Constellation Brands
right now to harvest tens of thousands of

57
00:02:53.470 --> 00:02:58.910
<v Fred Husman>tags from their batch DCS system, where
the beer is made as part of a brewing MES

58
00:02:58.910 --> 00:02:59.089
<v Fred Husman>project.

59
00:02:59.710 --> 00:03:03.350
<v Fred Husman>And for those that don't know
Constellation Brands, they operate some of the largest

60
00:03:03.350 --> 00:03:07.350
<v Fred Husman>breweries in the world, and their flagship
beer brands are Modelo and Corona.

61
00:03:08.119 --> 00:03:08.570
<v Cole Lewis>Thanks, Fred.

62
00:03:08.720 --> 00:03:12.649
<v Cole Lewis>That's great to hear about your experience
at Constellation Brands and the complex

63
00:03:12.649 --> 00:03:13.729
<v Cole Lewis>project that you're working on there.

64
00:03:14.009 --> 00:03:18.130
<v Cole Lewis>What first drew you to that challenge of
digitizing operations and how do you

65
00:03:18.130 --> 00:03:20.970
<v Cole Lewis>approach customers who might worry about
disruptions to production?

66
00:03:21.410 --> 00:03:25.729
<v Fred Husman>Many of our customers are concerned about
harvesting data from their operations

67
00:03:25.729 --> 00:03:28.210
<v Fred Husman>because they're worried about shutting
down their production.

68
00:03:28.500 --> 00:03:33.220
<v Fred Husman>They're also hesitant to start the
digitalization effort because they think that new

69
00:03:33.220 --> 00:03:37.419
<v Fred Husman>points of failure will be introduced, and
they, I would say they're right to be

70
00:03:37.419 --> 00:03:38.259
<v Fred Husman>concerned about that.

71
00:03:38.660 --> 00:03:42.860
<v Fred Husman>So we spent a significant time
demonstrating to Constellation Brands that we could

72
00:03:42.860 --> 00:03:47.179
<v Fred Husman>implement the MES system at the breweries
without shutting down the plant and

73
00:03:47.179 --> 00:03:50.440
<v Fred Husman>without putting beer making at risk
because in the end it's about the beer.

74
00:03:50.899 --> 00:03:54.979
<v Speaker 2>Well, cheers to that, Fred, and hopefully
we can lower the concern level for someone

75
00:03:54.979 --> 00:03:57.380
<v Speaker 2>in our audience as well that may have
those same concerns.

76
00:03:57.809 --> 00:04:00.190
<v Speaker 2>And I have a couple of questions I'd like
to pose to you.

77
00:04:00.649 --> 00:04:05.369
<v Speaker 2>At a high level, what problem was the
brewery trying to solve and why was no

78
00:04:05.369 --> 00:04:09.179
<v Speaker 2>disruption to life processes a hard
requirement from day one?

79
00:04:09.529 --> 00:04:13.690
<v Speaker 2>And the second question is, what were the
limitations of the existing paper-based

80
00:04:13.690 --> 00:04:16.049
<v Speaker 2>approach that ultimately forced change?

81
00:04:16.549 --> 00:04:20.309
<v Fred Husman>The Constellation Brands, they have a
corporate initiative to go digital across

82
00:04:20.309 --> 00:04:21.609
<v Fred Husman>their entire enterprise.

83
00:04:21.950 --> 00:04:25.829
<v Fred Husman>They have dozens of digitalization
projects that are executing in parallel.

84
00:04:25.910 --> 00:04:28.570
<v Fred Husman>The Brewing MES project is just one of
those.

85
00:04:28.950 --> 00:04:31.809
<v Fred Husman>It's the first and arguably the most
important.

86
00:04:32.070 --> 00:04:36.589
<v Fred Husman>The project delivers full order tracking
from their ERP software, SAP.

87
00:04:36.890 --> 00:04:41.089
<v Fred Husman>The project also delivers complete batch
traceability from the grain silos to the

88
00:04:41.089 --> 00:04:45.309
<v Fred Husman>brew house, fermentation and filtration
until finished beer is sent to packaging,

89
00:04:45.329 --> 00:04:48.869
<v Fred Husman>and then dozens of production reports are
now electronic.

90
00:04:49.410 --> 00:04:52.649
<v Fred Husman>As far as the limitations of the
paper-based approach, paper is not very.

91
00:04:52.730 --> 00:04:53.690
<v Fred Husman>Good way to do things.

92
00:04:53.769 --> 00:04:58.649
<v Fred Husman>There was incomplete records, inaccurate
records or reports, delayed reports, even

93
00:04:58.649 --> 00:05:02.440
<v Fred Husman>missing reports, and many of their
operators, they spent their entire shift just

94
00:05:02.440 --> 00:05:06.570
<v Fred Husman>filling out paper forms or manually
extracting data from the automation system just

95
00:05:06.570 --> 00:05:08.470
<v Fred Husman>to type it into an Excel spreadsheet.

96
00:05:08.890 --> 00:05:09.929
<v Fred Husman>That's what they did all day.

97
00:05:09.970 --> 00:05:14.640
<v Fred Husman>It's mind-numbing work, and now they can
focus instead on making better beer.

98
00:05:14.929 --> 00:05:18.559
<v Cole Lewis>Those limitations make sense, and I think
we all want to get out of those Excel

99
00:05:18.559 --> 00:05:22.119
<v Cole Lewis>spreadsheets and start doing more
value-added work and things that we were meant to

100
00:05:22.119 --> 00:05:22.970
<v Cole Lewis>do in our jobs.

101
00:05:23.130 --> 00:05:25.269
<v Cole Lewis>So maybe follow up to, to Don's previous
question.

102
00:05:25.839 --> 00:05:29.619
<v Cole Lewis>What were some of the biggest perceived
risks, whether that was product quality,

103
00:05:29.790 --> 00:05:33.559
<v Cole Lewis>uptime, or operator trust, and how did the
team address those concerns?

104
00:05:33.890 --> 00:05:37.549
<v Cole Lewis>Also related to those risks, how did you
ensure stakeholders were confident that

105
00:05:37.549 --> 00:05:39.820
<v Cole Lewis>production control would not be
compromised?

106
00:05:40.200 --> 00:05:44.399
<v Fred Husman>Well, I guess the biggest perceived risk
and to be honest, the biggest real risk.

107
00:05:44.790 --> 00:05:49.589
<v Fred Husman>was now needing not only the automation
system to be working correctly to make the

108
00:05:49.589 --> 00:05:54.510
<v Fred Husman>beer, but now you needed the MES system to
also be working correctly because we were

109
00:05:54.510 --> 00:05:56.350
<v Fred Husman>introducing another point of failure.

110
00:05:56.549 --> 00:06:01.609
<v Fred Husman>We implemented an OPCUA interface between
the automation system and the MES system,

111
00:06:01.829 --> 00:06:03.910
<v Fred Husman>but now that's a critical interface.

112
00:06:03.950 --> 00:06:05.010
<v Fred Husman>It has to work.

113
00:06:05.399 --> 00:06:09.920
<v Fred Husman>So we had to come up with a way to still
make beer if that interface stopped working

114
00:06:09.920 --> 00:06:10.600
<v Fred Husman>for a time.

115
00:06:10.880 --> 00:06:16.750
<v Fred Husman>We implemented data buffering directly in
the new MES data harvesting function

116
00:06:16.750 --> 00:06:22.239
<v Fred Husman>blocks in the DCS so that we could
tolerate that that MES to DCS interface being

117
00:06:22.239 --> 00:06:23.989
<v Fred Husman>down for some period of time.

118
00:06:24.160 --> 00:06:26.350
<v Fred Husman>We just set an hour for brewing.

119
00:06:26.399 --> 00:06:27.480
<v Fred Husman>That's, that's OK.

120
00:06:27.720 --> 00:06:28.839
<v Fred Husman>It's a slow process.

121
00:06:29.079 --> 00:06:29.799
<v Fred Husman>We tested it.

122
00:06:29.880 --> 00:06:30.359
<v Fred Husman>It works.

123
00:06:30.440 --> 00:06:32.779
<v Fred Husman>We don't lose any data and we can still
make beer.

124
00:06:33.149 --> 00:06:37.040
<v Fred Husman>Now regarding the stakeholders, after we
started the project work, the Constellation

125
00:06:37.040 --> 00:06:41.679
<v Fred Husman>Brands, we call them CBI, their top
management was concerned that we could pull this

126
00:06:41.679 --> 00:06:42.519
<v Fred Husman>all off.

127
00:06:42.959 --> 00:06:47.040
<v Fred Husman>So about halfway through the
implementation, we had an executive update meeting at

128
00:06:47.040 --> 00:06:50.059
<v Fred Husman>the CBI Beer Division headquarters in San
Antonio, Texas.

129
00:06:50.440 --> 00:06:54.519
<v Fred Husman>After that meeting, we gained their
confidence, and now their question is how fast

130
00:06:54.519 --> 00:06:56.480
<v Fred Husman>can they go digital at all the breweries.

131
00:06:57.049 --> 00:07:00.779
<v Speaker 2>Yeah, that's a pretty good point you make
there about getting the executives on

132
00:07:00.779 --> 00:07:01.119
<v Speaker 2>board.

133
00:07:01.260 --> 00:07:05.660
<v Speaker 2>Uh, that's a topic that's come up from
time to time in our other episodes is making

134
00:07:05.660 --> 00:07:07.230
<v Speaker 2>sure you have that executive support.

135
00:07:07.339 --> 00:07:11.459
<v Speaker 2>So, like you said earlier, there's a lot
of extra things you're adding to it that

136
00:07:11.459 --> 00:07:13.799
<v Speaker 2>might add other levels of risk and
concern.

137
00:07:14.140 --> 00:07:17.220
<v Speaker 2>And I'm sure that raised their level of
concern as well, but it sounds like you guys

138
00:07:17.220 --> 00:07:19.250
<v Speaker 2>did a great job in getting their, their
confidence.

139
00:07:19.299 --> 00:07:20.079
<v Speaker 2>So that's great.

140
00:07:20.660 --> 00:07:24.899
<v Speaker 2>So, Fred, let's, let's talk about
separating data collection from core production

141
00:07:24.899 --> 00:07:25.500
<v Speaker 2>logic.

142
00:07:26.049 --> 00:07:28.869
<v Speaker 2>What does that mean in practical terms on
the plant floor?

143
00:07:29.290 --> 00:07:33.170
<v Speaker 2>And, and why is that separation so
critical when you're digitizing live operations

144
00:07:33.170 --> 00:07:33.929
<v Speaker 2>at scale?

145
00:07:34.369 --> 00:07:37.519
<v Fred Husman>So, the CBI breweries, they are large and
flexible.

146
00:07:37.920 --> 00:07:42.929
<v Fred Husman>You know, breweries are just that way, but
flexibility means complicated at the

147
00:07:42.929 --> 00:07:43.929
<v Fred Husman>automation layer.

148
00:07:44.049 --> 00:07:48.250
<v Fred Husman>There are sometimes hundreds of source and
destination combinations for one

149
00:07:48.250 --> 00:07:48.790
<v Fred Husman>transfer.

150
00:07:49.269 --> 00:07:54.109
<v Fred Husman>This means there is a lot of complicated
automation logic down in the DCS, and then

151
00:07:54.109 --> 00:07:55.910
<v Fred Husman>you have batch management in the mix.

152
00:07:56.070 --> 00:08:00.390
<v Fred Husman>So the DCS code was already hard enough to
decipher before adding a bunch of data

153
00:08:00.390 --> 00:08:01.429
<v Fred Husman>harvesting blocks.

154
00:08:01.630 --> 00:08:05.980
<v Fred Husman>The way we wound up modifying the DCS
code, it is obvious which code is there to

155
00:08:05.980 --> 00:08:09.589
<v Fred Husman>make beer and which code is there for MES
data harvesting purposes.

156
00:08:09.670 --> 00:08:13.529
<v Fred Husman>That separation is obvious in the
controllers and in the HMI application.

157
00:08:14.480 --> 00:08:18.929
<v Cole Lewis>Yeah, hearing how complex that DCS logic
is, I imagine you can't just go and make

158
00:08:18.929 --> 00:08:22.279
<v Cole Lewis>these changes in trial or production and,
and play around with that.

159
00:08:22.369 --> 00:08:26.320
<v Cole Lewis>I know your approach included some
full-scale virtual simulization of your entire

160
00:08:26.320 --> 00:08:26.850
<v Cole Lewis>brewery.

161
00:08:27.170 --> 00:08:31.070
<v Cole Lewis>So how did simulation play in and what did
simulation allow you to test or validate

162
00:08:31.450 --> 00:08:33.070
<v Cole Lewis>before touching the real systems?

163
00:08:33.289 --> 00:08:35.090
<v Cole Lewis>Did it change the speed or safety of the
decision?

164
00:08:35.622 --> 00:08:38.153
<v Cole Lewis>Compared to maybe a more traditional
rollout approach.

165
00:08:38.612 --> 00:08:42.083
<v Fred Husman>For this kind of project, there was, there
was no way to do it without a lot of

166
00:08:42.083 --> 00:08:42.622
<v Fred Husman>testing.

167
00:08:42.893 --> 00:08:47.853
<v Fred Husman>We're harvesting tens of thousands of tags
from the DCS as beer is made.

168
00:08:48.093 --> 00:08:52.973
<v Fred Husman>So we need to collect data to track every
single automatic raw material and product

169
00:08:52.973 --> 00:08:55.072
<v Fred Husman>transfer and every manual edition.

170
00:08:55.172 --> 00:08:55.932
<v Fred Husman>There's a lot of those.

171
00:08:56.335 --> 00:09:01.255
<v Fred Husman>We also need to collect thousands of data
elements to populate all of the dozens of

172
00:09:01.255 --> 00:09:02.325
<v Fred Husman>production reports.

173
00:09:02.656 --> 00:09:06.375
<v Fred Husman>The only way to test all this data
collection is to run recipes all the way through

174
00:09:06.375 --> 00:09:08.265
<v Fred Husman>the batch system, and that's not easy.

175
00:09:08.416 --> 00:09:12.435
<v Fred Husman>So to do that, you need a simulation
system or a digital twin to do it.

176
00:09:12.616 --> 00:09:17.935
<v Fred Husman>And at first, we planned to use the
hardware-based simulation architecture, but for

177
00:09:17.935 --> 00:09:22.776
<v Fred Husman>this large CBI brewery project, the cost
of the hardware-based solution was

178
00:09:22.776 --> 00:09:25.236
<v Fred Husman>approaching $1 million and it just wasn't
going to happen.

179
00:09:25.890 --> 00:09:30.890
<v Fred Husman>Then we investigated a software-based
virtual controller simulation solution, and in

180
00:09:30.890 --> 00:09:35.210
<v Fred Husman>the end it worked for our purposes with
the batch manager and the DCS, and the cost

181
00:09:35.210 --> 00:09:39.890
<v Fred Husman>of that virtual controller solution was
about 10% of the hardware-based solution, so

182
00:09:39.890 --> 00:09:41.260
<v Fred Husman>for about 100,000.

183
00:09:41.570 --> 00:09:45.929
<v Fred Husman>We used that virtual controller digital
twin for iterative testing for an entire

184
00:09:45.929 --> 00:09:46.159
<v Fred Husman>year.

185
00:09:46.239 --> 00:09:50.010
<v Fred Husman>We could not have properly tested that
system without it, so the team would have

186
00:09:50.010 --> 00:09:53.530
<v Fred Husman>been terrified to go to go live without
that testing under their belt.

187
00:09:54.010 --> 00:09:57.929
<v Speaker 2>Well, it's great to hear how much you were
able to leverage the uh simulation

188
00:09:57.929 --> 00:10:01.119
<v Speaker 2>technology and particularly that, that
virtual controller and how that, that worked

189
00:10:01.119 --> 00:10:02.840
<v Speaker 2>so well and saved so much cost.

190
00:10:02.929 --> 00:10:03.830
<v Speaker 2>That's, that's great.

191
00:10:04.250 --> 00:10:08.070
<v Speaker 2>Let's talk in terms of how this project
can be leveraged beyond brewing.

192
00:10:08.690 --> 00:10:13.010
<v Speaker 2>Which lessons from this brewery example do
you think would translate well to other

193
00:10:13.010 --> 00:10:15.010
<v Speaker 2>manufacturing environments or industries?

194
00:10:15.570 --> 00:10:20.380
<v Fred Husman>Yeah, I, I, I think that our solution
works for all industries, uh, at least all the

195
00:10:20.380 --> 00:10:21.419
<v Fred Husman>processing industries.

196
00:10:21.679 --> 00:10:22.940
<v Fred Husman>The automation layer could be different.

197
00:10:23.020 --> 00:10:25.849
<v Fred Husman>The MES layer could be different, but I
think our solution still works.

198
00:10:26.140 --> 00:10:32.280
<v Fred Husman>I think the key is to use a standard and
supported interface like OPCUA.

199
00:10:32.739 --> 00:10:36.700
<v Fred Husman>Also design a way to tolerate that
interface being down for a time.

200
00:10:37.534 --> 00:10:40.275
<v Fred Husman>and build a digital twin to test all the
data collection.

201
00:10:40.505 --> 00:10:42.715
<v Fred Husman>If you do those three things, you can be
successful.

202
00:10:42.905 --> 00:10:46.585
<v Fred Husman>And I guess one more important part of the
solution is finding a way that the

203
00:10:46.585 --> 00:10:49.674
<v Fred Husman>automation team can work independently
from the MES team.

204
00:10:49.744 --> 00:10:54.344
<v Fred Husman>Like in our case, a different vendor
worked on the DCS beer making code, while the

205
00:10:54.344 --> 00:10:57.984
<v Fred Husman>Sky IO team worked separately on the DCS
MES code.

206
00:10:58.419 --> 00:11:02.729
<v Fred Husman>So we worked apart for many months and
tested on separate digital twins.

207
00:11:02.780 --> 00:11:03.840
<v Fred Husman>That's an important point.

208
00:11:04.140 --> 00:11:09.859
<v Fred Husman>So before go live, we merged our tested
projects, tested projects together using the

209
00:11:09.859 --> 00:11:12.020
<v Fred Husman>DCS textual interconnection feature.

210
00:11:12.260 --> 00:11:15.820
<v Fred Husman>That was a big deal and it enabled us to
go live much faster.

211
00:11:15.979 --> 00:11:20.780
<v Fred Husman>We didn't have to wait for the automation
code to be done before we could start

212
00:11:20.780 --> 00:11:24.659
<v Fred Husman>making progress on the MES, and we had a
good way to bring them together just in

213
00:11:24.659 --> 00:11:25.500
<v Fred Husman>time for go live.

214
00:11:26.059 --> 00:11:26.539
<v Cole Lewis>Thanks, Fred.

215
00:11:26.700 --> 00:11:30.140
<v Cole Lewis>Yeah, those are great lessons, and that's
cool to hear about how both teams are able

216
00:11:30.140 --> 00:11:33.809
<v Cole Lewis>to work separately but then come together
at the end and put everything into

217
00:11:33.809 --> 00:11:35.450
<v Cole Lewis>production, go live much faster.

218
00:11:35.940 --> 00:11:40.020
<v Cole Lewis>What's one of the mindset shifts that
organizations need to make before technology

219
00:11:40.020 --> 00:11:41.299
<v Cole Lewis>can really help them at scale?

220
00:11:42.190 --> 00:11:46.669
<v Fred Husman>So I think AI is a big topic now, and most
organizations do realize that they must

221
00:11:46.669 --> 00:11:51.109
<v Fred Husman>leverage AI to stay competitive, but they
won't be able to leverage AI in their

222
00:11:51.109 --> 00:11:55.789
<v Fred Husman>operations unless they have a unified name
space for AI to evaluate, and companies

223
00:11:55.789 --> 00:12:01.299
<v Fred Husman>are way behind on harvesting
contextualized data that they need from the OT layer.

224
00:12:01.630 --> 00:12:02.989
<v Fred Husman>That's what this project was about.

225
00:12:03.719 --> 00:12:08.119
<v Fred Husman>And from my experience, AI is not going to
help much with that contextualization

226
00:12:08.119 --> 00:12:08.450
<v Fred Husman>part.

227
00:12:08.799 --> 00:12:13.320
<v Fred Husman>Companies need to partner with a vendor
that is good at IT OT integration and can

228
00:12:13.320 --> 00:12:17.659
<v Fred Husman>get to the OT data and contextualize it at
the point of capture.

229
00:12:18.429 --> 00:12:19.119
<v Fred Husman>Not later.

230
00:12:19.929 --> 00:12:24.010
<v Speaker 2>Yeah, that's definitely an important
point, Fred, and, uh, I know you kicked off at

231
00:12:24.010 --> 00:12:26.489
<v Speaker 2>the beginning of our conversation talking
a little bit about AI.

232
00:12:26.690 --> 00:12:30.210
<v Speaker 2>Not surprised to hear it come in here at
the end of this become a really key topic.

233
00:12:30.330 --> 00:12:31.400
<v Speaker 2>So interesting to hear that.

234
00:12:31.479 --> 00:12:32.669
<v Speaker 2>That's definitely a good point.

235
00:12:33.010 --> 00:12:36.609
<v Speaker 2>As we wrap up our conversation, we always
like to include some key takeaways.

236
00:12:36.650 --> 00:12:40.000
<v Speaker 2>We talked about a lot of different topics
in our, in our brief time together here.

237
00:12:40.250 --> 00:12:44.210
<v Speaker 2>If you could pull out what you think are
the key takeaways that you can leave with

238
00:12:44.210 --> 00:12:45.489
<v Speaker 2>our audience, what would they be?

239
00:12:45.969 --> 00:12:47.520
<v Fred Husman>Yeah, I think I have 4.

240
00:12:47.849 --> 00:12:52.380
<v Fred Husman>1st, automated data capture right now for
most companies, especially in the

241
00:12:52.380 --> 00:12:56.530
<v Fred Husman>processing industries, operators are
collecting all the data, and it's a huge manual

242
00:12:56.530 --> 00:13:00.460
<v Fred Husman>process, and it's really all they do all
day long, you know, they fill out forms.

243
00:13:00.539 --> 00:13:04.780
<v Fred Husman>They actually pull data manually from the
HMI and the control system and then type

244
00:13:04.780 --> 00:13:05.799
<v Fred Husman>it into a spreadsheet.

245
00:13:05.929 --> 00:13:07.770
<v Fred Husman>All that's done automated now.

246
00:13:07.969 --> 00:13:13.059
<v Fred Husman>All that data capture and all those report
populations are all done automated and

247
00:13:13.059 --> 00:13:13.940
<v Fred Husman>electronically.

248
00:13:14.340 --> 00:13:15.780
<v Fred Husman>And that's really the foundation.

249
00:13:15.900 --> 00:13:19.140
<v Fred Husman>It makes everything else in the digital
transformation stack work.

250
00:13:19.340 --> 00:13:20.409
<v Fred Husman>So that's step one.

251
00:13:20.780 --> 00:13:24.979
<v Fred Husman>And you can do it as we've shown without
impacting production and while the plant is

252
00:13:24.979 --> 00:13:25.409
<v Fred Husman>running.

253
00:13:25.739 --> 00:13:29.539
<v Fred Husman>So, this is the first step and companies,
if they want to leverage AI they got to

254
00:13:29.539 --> 00:13:30.760
<v Fred Husman>get started on this step.

255
00:13:31.590 --> 00:13:35.739
<v Fred Husman>Second, I would say is, you know, there's
a little bit of fear about going digital,

256
00:13:35.830 --> 00:13:39.070
<v Fred Husman>especially by certain groups like the
operations level.

257
00:13:39.150 --> 00:13:42.750
<v Fred Husman>A lot of the operators think it's going to
eliminate their job, but, but in reality,

258
00:13:42.849 --> 00:13:45.770
<v Fred Husman>I think digitalization empowers the
operator.

259
00:13:45.869 --> 00:13:50.469
<v Fred Husman>What it does eliminate is the operator's
time to manually log the production counts

260
00:13:50.469 --> 00:13:53.549
<v Fred Husman>and the downtime events and the quality
checks and the material consumption.

261
00:13:53.869 --> 00:13:58.630
<v Fred Husman>And instead they can focus on the higher
value human centric tasks such as critical

262
00:13:58.630 --> 00:14:01.549
<v Fred Husman>decision making, exception handling, and
process optimization.

263
00:14:01.789 --> 00:14:06.219
<v Fred Husman>Basically operators can now focus on
making better products or beer in this case.

264
00:14:06.469 --> 00:14:09.650
<v Fred Husman>A third takeaway, everyone's talking about
AI.

265
00:14:10.380 --> 00:14:13.140
<v Fred Husman>And they, they right away want to say,
hey, how can we leverage AI?

266
00:14:13.429 --> 00:14:16.369
<v Fred Husman>But they can't really do it until they
have the data lake.

267
00:14:16.659 --> 00:14:18.140
<v Fred Husman>You can't just start using AI.

268
00:14:18.380 --> 00:14:19.679
<v Fred Husman>You basically ask AI a question.

269
00:14:19.869 --> 00:14:24.020
<v Fred Husman>Well, it can't give you an answer unless
it has this data lake of one source of

270
00:14:24.020 --> 00:14:26.700
<v Fred Husman>truth to evaluate and then get back to
you.

271
00:14:26.900 --> 00:14:30.739
<v Fred Husman>So step one is you need to start working
on the one source of truth right now.

272
00:14:31.520 --> 00:14:36.530
<v Fred Husman>Once you have that data lay created, then
AI can unlock immediate value for the

273
00:14:36.530 --> 00:14:40.289
<v Fred Husman>operators through predictive maintenance,
machine learning, advanced process

274
00:14:40.289 --> 00:14:42.830
<v Fred Husman>control, smart alarm management, all that
stuff.

275
00:14:43.130 --> 00:14:47.669
<v Fred Husman>And we really think where it's going is
that a genetic AI will evolve to the point

276
00:14:47.969 --> 00:14:51.969
<v Fred Husman>pretty quickly where it taps the operator
on the shoulder and says that the current

277
00:14:51.969 --> 00:14:56.289
<v Fred Husman>batch, the batch running right now, is
about to get away from you, and here is what

278
00:14:56.289 --> 00:14:57.510
<v Fred Husman>you need to do about it.

279
00:14:57.890 --> 00:14:59.229
<v Fred Husman>A final takeaway.

280
00:14:59.539 --> 00:15:02.619
<v Fred Husman>The key, I think for, for the companies
that are starting down this journey,

281
00:15:03.140 --> 00:15:08.619
<v Fred Husman>especially on the MES implementation, is
to partner with a vendor that is good at

282
00:15:08.619 --> 00:15:09.289
<v Fred Husman>orchestrating.

283
00:15:09.340 --> 00:15:12.570
<v Fred Husman>They call it orchestration between IT and
OT, but that's the key.

284
00:15:12.739 --> 00:15:17.159
<v Fred Husman>So you have to find a partner that can
bridge that OTIT convergence gap that's

285
00:15:17.159 --> 00:15:17.840
<v Fred Husman>happening.

286
00:15:18.340 --> 00:15:22.179
<v Fred Husman>So you need a partner that understands
both the plant floor and the IT architecture,

287
00:15:22.289 --> 00:15:23.960
<v Fred Husman>and we have had many customers.

288
00:15:24.390 --> 00:15:29.880
<v Fred Husman>They start down this path and and and and,
and, and they partner with a, like an IT

289
00:15:29.880 --> 00:15:34.190
<v Fred Husman>I would say, centric integrator, and then
they come back to us later because they

290
00:15:34.190 --> 00:15:38.869
<v Fred Husman>learned that that IT only vendor didn't,
what they say, have the OT chops.

291
00:15:38.919 --> 00:15:44.030
<v Fred Husman>Basically, they struggled on that OT data
harvesting contextualization part, and

292
00:15:44.030 --> 00:15:45.059
<v Fred Husman>that's step one.

293
00:15:45.390 --> 00:15:48.710
<v Fred Husman>Then that's what our customers say, but
SCIIO can do both sides.

294
00:15:49.390 --> 00:15:54.320
<v Speaker 2>Fred, I think those were 4 great takeaways
and, and can only come from 35 years of

295
00:15:54.320 --> 00:15:54.530
<v Speaker 2>experience.

296
00:15:54.640 --> 00:15:57.760
<v Speaker 2>So I really appreciate you spending some
time with us today and sharing those with

297
00:15:57.760 --> 00:15:58.510
<v Speaker 2>our audience.

298
00:15:58.880 --> 00:16:00.400
<v Speaker 2>So thanks for joining us today, Fred.

299
00:16:00.840 --> 00:16:01.440
<v Fred Husman>Thanks for having me.

300
00:16:01.479 --> 00:16:03.429
<v Fred Husman>I was happy to participate and I had fun.

301
00:16:03.719 --> 00:16:05.739
<v Speaker 2>And that does bring us to the end of this
episode.

302
00:16:06.369 --> 00:16:10.140
<v Speaker 2>If you have questions about any of the
topics we discussed today, please feel free

303
00:16:10.140 --> 00:16:11.510
<v Speaker 2>to connect with Fred directly.

304
00:16:11.619 --> 00:16:16.179
<v Speaker 2>His contact information is included in the
show notes, and Cole and I are always

305
00:16:16.179 --> 00:16:20.260
<v Speaker 2>open to your comments, your thoughts and
feedback on the show or the topics.

306
00:16:20.619 --> 00:16:23.419
<v Speaker 2>You can also find our contact information
in the show notes.

307
00:16:23.500 --> 00:16:24.679
<v Speaker 2>We'd love to hear from you.

308
00:16:25.289 --> 00:16:28.619
<v Speaker 2>If you liked what you heard today, please
help to spread the word by rating the

309
00:16:28.619 --> 00:16:29.039
<v Speaker 2>show.

310
00:16:29.340 --> 00:16:32.659
<v Speaker 2>And if you're not already a subscriber and
would like to be notified when new

311
00:16:32.659 --> 00:16:35.520
<v Speaker 2>episodes are released, please subscribe to
the series.

312
00:16:35.979 --> 00:16:39.330
<v Speaker 2>Thank you for listening to this episode of
Digitalization

313
00:16:39.330 --> 00:16:40.380
<v Speaker 1>Techbooks.