WEBVTT
Language: en-US

1
00:00:10.100 --> 00:00:12.260
<v John Lester>Hello and welcome to Buildings of
Tomorrow.

2
00:00:12.380 --> 00:00:16.620
<v John Lester>My name's John Lester, and in today's
episode we are talking about bringing 3D

3
00:00:16.620 --> 00:00:21.219
<v John Lester>scanning into the delivery phase and using
as its own discipline to help derive

4
00:00:21.219 --> 00:00:25.479
<v John Lester>value, not just through that delivery
phase, but also through the operational phase.

5
00:00:25.940 --> 00:00:27.379
<v John Lester>I'm joined today by Kevin Bauer.

6
00:00:27.500 --> 00:00:32.220
<v John Lester>He is the lead for BIMM and Digital twin
at Siemens Smart-Infrastructure in Europe.

7
00:00:32.419 --> 00:00:33.619
<v John Lester>Kevin, thank you for joining us.

8
00:00:34.580 --> 00:00:34.779
<v Kevin Bauer>Hi.

9
00:00:34.900 --> 00:00:35.500
<v Kevin Bauer>Welcome, John.

10
00:00:35.659 --> 00:00:37.080
<v Kevin Bauer>Really happy to be here again today.

11
00:00:37.930 --> 00:00:38.880
<v John Lester>It's an absolute pleasure.

12
00:00:38.889 --> 00:00:42.470
<v John Lester>We always have a great discussion, so I'm
excited about having another one today.

13
00:00:43.569 --> 00:00:47.799
<v John Lester>In the past we've talked a little bit
about BIM and the digital twin, constructing

14
00:00:47.799 --> 00:00:52.650
<v John Lester>this, you know, through the BIM process,
constructing that level of detail into that

15
00:00:52.650 --> 00:00:58.169
<v John Lester>digital twin to really enable not just all
the benefits that we know BI BIM as a

16
00:00:58.169 --> 00:01:03.049
<v John Lester>process brings, and you as a, as a
certified trainer at Building Smart

17
00:01:03.049 --> 00:01:05.269
<v John Lester>International, know and understand that as
well as anybody.

18
00:01:06.510 --> 00:01:11.599
<v John Lester>But also leveraging that information,
building that operational twin which enables

19
00:01:11.599 --> 00:01:13.959
<v John Lester>us to find benefits in that process.

20
00:01:14.040 --> 00:01:18.860
<v John Lester>And through those discussions we've
touched a little bit on integrating 3D scanning

21
00:01:19.279 --> 00:01:22.720
<v John Lester>almost as its own discipline as part of
that delivery phase.

22
00:01:24.370 --> 00:01:26.440
<v John Lester>As we jump into that, let's start at the
start.

23
00:01:27.489 --> 00:01:28.129
<v John Lester>Give us an idea.

24
00:01:28.260 --> 00:01:30.449
<v John Lester>Why did this idea come about?

25
00:01:30.650 --> 00:01:33.250
<v John Lester>Why did you start to think about 3D
scanning in this way?

26
00:01:33.389 --> 00:01:39.209
<v John Lester>And, and what was it that created or, or,
or drove you to take the plunge with 3D

27
00:01:39.209 --> 00:01:42.050
<v John Lester>scanning in these particular projects?

28
00:01:43.860 --> 00:01:48.220
<v Kevin Bauer>You know, uh, for us at Siemens, what the
infrastructure is all about optimizing the

29
00:01:48.220 --> 00:01:54.440
<v Kevin Bauer>billing operations from a, uh, technical
facilitational perspective and from a, uh,

30
00:01:54.940 --> 00:01:58.459
<v Kevin Bauer>energy perspective, and there, we work a
lot on the topic, digital twin.

31
00:01:59.300 --> 00:02:06.010
<v Kevin Bauer>So how can we combine data, IoT and
billing automation data to enhance again energy

32
00:02:06.010 --> 00:02:08.479
<v Kevin Bauer>optimistic, energy and technical billing
operations?

33
00:02:09.229 --> 00:02:12.740
<v Kevin Bauer>Uh, but the big question was every time,
yeah, how do we get to this digital twin,

34
00:02:12.789 --> 00:02:18.199
<v Kevin Bauer>yeah, you know, digital twin definition is
the digital representation of, um,

35
00:02:18.520 --> 00:02:24.470
<v Kevin Bauer>digital asset, officially, physical asset,
which also allows the command and

36
00:02:24.470 --> 00:02:24.869
<v Kevin Bauer>control.

37
00:02:25.750 --> 00:02:29.729
<v Kevin Bauer>But as we know, you know, the construction
industry is a little bit chaotic.

38
00:02:31.279 --> 00:02:37.580
<v Kevin Bauer>And, you know, um, um, from our
experience, we know we have some often hard times,

39
00:02:38.240 --> 00:02:40.149
<v Kevin Bauer>it's getting really to this is built.

40
00:02:41.339 --> 00:02:43.520
<v Kevin Bauer>Which is let's say the digital
representation.

41
00:02:44.059 --> 00:02:49.460
<v Kevin Bauer>And then we thought about, let's say, why
not integrating mobile 3D scanning.

42
00:02:50.190 --> 00:02:56.619
<v Kevin Bauer>In the construction process to bring them
from our S plant phase

43
00:02:57.570 --> 00:03:03.100
<v Kevin Bauer>to an SP phase, or let's say, um, get 3D
scans, which we can take tend to check

44
00:03:03.100 --> 00:03:09.600
<v Kevin Bauer>against the S build models to then
afterwards, um, control the contractors, the

45
00:03:09.600 --> 00:03:12.750
<v Kevin Bauer>electrical, mechanical, and the structural
contractors.

46
00:03:13.690 --> 00:03:18.500
<v Kevin Bauer>To check if, let's say all the spilled
documentation delivered is really a spilled

47
00:03:18.500 --> 00:03:22.179
<v Kevin Bauer>because a digital twin is as good, just as
good as the data it has, yeah.

48
00:03:23.139 --> 00:03:28.100
<v John Lester>Yeah, so, so that process, because,
because a construction phase, a delivery phase

49
00:03:28.100 --> 00:03:33.460
<v John Lester>is, is a, is a crazy time at the, you
know, at different stages throughout that

50
00:03:33.460 --> 00:03:38.139
<v John Lester>process, um, you had that experience that
when you got to the end of that delivery

51
00:03:38.139 --> 00:03:43.259
<v John Lester>phase, those as-built drawings, which
really should be updated and represent exactly

52
00:03:43.259 --> 00:03:48.460
<v John Lester>what's handed over on completion day, they
weren't up to the standard or accuracy

53
00:03:48.460 --> 00:03:49.259
<v John Lester>that you expected.

54
00:03:49.820 --> 00:03:50.479
<v Kevin Bauer>Exactly, yeah.

55
00:03:51.100 --> 00:03:56.100
<v Kevin Bauer>It was like this, um, at the Aspen project
in, in Vienna, which we talk, talk all

56
00:03:56.100 --> 00:03:57.339
<v Kevin Bauer>the time, yeah, it was like this.

57
00:03:58.360 --> 00:04:01.699
<v Kevin Bauer>That we had this 3D scans and then we sat
together with the billion owner.

58
00:04:02.550 --> 00:04:05.850
<v Kevin Bauer>And asked, asked the installer, yeah,
because we already checked in advance.

59
00:04:06.949 --> 00:04:07.949
<v Kevin Bauer>Lovely installer, yeah.

60
00:04:08.869 --> 00:04:10.740
<v Kevin Bauer>You know, we checked up your
documentation.

61
00:04:13.279 --> 00:04:18.739
<v Kevin Bauer>And, but you know, youril documentation is
just, you just change the name as your,

62
00:04:18.809 --> 00:04:20.089
<v Kevin Bauer>from your execution design.

63
00:04:20.850 --> 00:04:25.369
<v Kevin Bauer>And changed the name to SBuilder, um, but
it's not SBuild because we see it from the

64
00:04:25.369 --> 00:04:26.250
<v Kevin Bauer>3D scans there.

65
00:04:27.019 --> 00:04:31.059
<v Kevin Bauer>And he said, he does it every time like
this, because he said it's industry

66
00:04:31.059 --> 00:04:31.519
<v Kevin Bauer>standard.

67
00:04:32.899 --> 00:04:37.220
<v John Lester>Right, so as an industry, sometimes we're
not, in general, we're not really

68
00:04:37.220 --> 00:04:41.739
<v John Lester>delivering these as-built drawings as you
know, as the name suggests, and that

69
00:04:41.739 --> 00:04:46.899
<v John Lester>leaves us a big gap, especially when you
want to start like you describe, using

70
00:04:46.899 --> 00:04:51.339
<v John Lester>those drawings as the basis for
operational activities, you know, whether that's

71
00:04:51.339 --> 00:04:56.720
<v John Lester>maintenance or or space optimization or
location tracking or whatever it might be,

72
00:04:58.410 --> 00:05:00.260
<v John Lester>the detail and the data.

73
00:05:01.019 --> 00:05:07.630
<v John Lester>It directly impacts the ability for those
kind of operations to work well, um, So,

74
00:05:07.929 --> 00:05:10.769
<v John Lester>you went through the construction phase,
you realized that that information that's

75
00:05:10.769 --> 00:05:15.290
<v John Lester>handed over on the last day, on handover
day doesn't give you the level of, of

76
00:05:15.290 --> 00:05:18.440
<v John Lester>detail or the accuracy that was required.

77
00:05:18.890 --> 00:05:23.980
<v John Lester>How then did you build this 3D scanning
approach into your process in this Asper

78
00:05:23.980 --> 00:05:24.950
<v John Lester>project as an example?

79
00:05:27.250 --> 00:05:31.809
<v Kevin Bauer>It's, it's really important to really
integrate, uh, 3D scanning and 3D mobile

80
00:05:31.809 --> 00:05:34.220
<v Kevin Bauer>scanning into the construction process.

81
00:05:34.299 --> 00:05:39.279
<v Kevin Bauer>So what we did is let's say we, we went
through the uh construction schedule.

82
00:05:40.100 --> 00:05:44.779
<v Kevin Bauer>I thought about, yeah, how could we
integrate as its own discipline to at the end

83
00:05:44.779 --> 00:05:47.660
<v Kevin Bauer>have really built 3D scans.

84
00:05:48.350 --> 00:05:52.029
<v Kevin Bauer>And then let's say we, we identified that
we have 3 main phases.

85
00:05:52.239 --> 00:05:53.790
<v Kevin Bauer>Phase 1 is the structural phase.

86
00:05:54.540 --> 00:05:59.899
<v Kevin Bauer>Uh, you know, you do all the concrete
stuff, uh, phase 2 is the equipment phase, you

87
00:05:59.899 --> 00:06:06.690
<v Kevin Bauer>know, where you integrate HVAC systems,
uh, um, piping systems, you know, the,

88
00:06:06.700 --> 00:06:11.869
<v Kevin Bauer>all the, The sanitary, then you have all
the cable traces kind of stuff, and the 3rd

89
00:06:11.869 --> 00:06:16.950
<v Kevin Bauer>phase is the SP phase where you do all the
finishing, the floors, spend it fillings,

90
00:06:16.959 --> 00:06:17.640
<v Kevin Bauer>and this kind of stuff.

91
00:06:17.920 --> 00:06:23.880
<v Kevin Bauer>So, so we have had 3 main phases, and then
we really integrated the mobile scanning

92
00:06:23.880 --> 00:06:28.760
<v Kevin Bauer>into the port, porters, which means when
the people, uh, the workers worked in the

93
00:06:28.760 --> 00:06:32.859
<v Kevin Bauer>2nd floor because they already finished
the structural work in the 1st floor.

94
00:06:33.279 --> 00:06:36.480
<v Kevin Bauer>They work on the 2nd floor, we scanned the
1st floor, and when they were working the

95
00:06:36.480 --> 00:06:38.519
<v Kevin Bauer>3rd floor, we scanned the 2nd floor, yeah.

96
00:06:39.109 --> 00:06:43.859
<v Kevin Bauer>And when they put the, the, the electrical
cable trays, we scanned the cable trays

97
00:06:43.859 --> 00:06:44.959
<v Kevin Bauer>and this kind of stuff.

98
00:06:45.040 --> 00:06:48.260
<v Kevin Bauer>At the end, we did 18 3D scans, yeah.

99
00:06:48.989 --> 00:06:49.299
<v John Lester>Wow.

100
00:06:50.109 --> 00:06:53.630
<v John Lester>Yeah, and, and that was my next question,
and you described it a little bit there as

101
00:06:53.630 --> 00:06:56.869
<v John Lester>well, especially if we talk about high
rise constructions and things like this.

102
00:06:56.950 --> 00:07:01.640
<v John Lester>That means you're out there doing quite a
lot of scanning and then managing that

103
00:07:01.640 --> 00:07:06.149
<v John Lester>data depending on the different phases of
the different pieces of the building at

104
00:07:06.149 --> 00:07:06.850
<v John Lester>that time.

105
00:07:09.359 --> 00:07:13.730
<v John Lester>Uh, then the question for me is, so you
went through this process, you know, you

106
00:07:13.730 --> 00:07:18.359
<v John Lester>identified the need, you've built in 3D
scanning as a discipline, you've built it in

107
00:07:18.359 --> 00:07:19.609
<v John Lester>as part of the standard process.

108
00:07:19.690 --> 00:07:25.089
<v John Lester>So these three different phases of the
delivery, uh, you know, the delivery piece of

109
00:07:25.089 --> 00:07:30.209
<v John Lester>a building, uh, at the, the structural,
uh, the services, and then the, the as

110
00:07:30.209 --> 00:07:30.670
<v John Lester>built.

111
00:07:31.079 --> 00:07:32.630
<v John Lester>You've collected all the scan information.

112
00:07:33.390 --> 00:07:37.299
<v John Lester>Uh, and you gave us a little bit of an
insight already as to, you know, comparing

113
00:07:37.299 --> 00:07:41.040
<v John Lester>the, the plans or the documentation to
the, the reality.

114
00:07:42.190 --> 00:07:45.320
<v John Lester>Let's have a little bit of a discussion
about some of the other values or the things

115
00:07:45.320 --> 00:07:50.450
<v John Lester>that you discovered along the way that,
that you could use these 3D scans for, um,

116
00:07:50.739 --> 00:07:52.859
<v John Lester>to, to add value to the different
stakeholders.

117
00:07:53.190 --> 00:07:58.079
<v John Lester>Um, let's, let's start with that, that
first one that you've already described,

118
00:07:58.160 --> 00:07:59.420
<v John Lester>which is comparing.

119
00:07:59.809 --> 00:08:06.170
<v John Lester>The plans, so comparing what's what's been
approved, what's been, what's then

120
00:08:06.170 --> 00:08:07.929
<v John Lester>expected to the real thing.

121
00:08:08.279 --> 00:08:12.450
<v John Lester>How did that work when you started to use
these 3D scans to really compare, even at

122
00:08:12.450 --> 00:08:18.609
<v John Lester>the structural phase, the positioning and
the, the, the, the, you know what is

123
00:08:18.609 --> 00:08:20.869
<v John Lester>really delivered compared to what's
expected?

124
00:08:21.670 --> 00:08:21.690
<v Kevin Bauer>Mhm.

125
00:08:22.130 --> 00:08:25.410
<v Kevin Bauer>Yeah, probably, let's talk a little bit
about the pain, what people have today,

126
00:08:25.730 --> 00:08:26.149
<v Kevin Bauer>today.

127
00:08:26.609 --> 00:08:30.690
<v Kevin Bauer>Construction is a little bit of a
complicated industry, and you know, there you have

128
00:08:30.690 --> 00:08:33.859
<v Kevin Bauer>uh uh site super consultants, a site
supervision.

129
00:08:34.770 --> 00:08:39.609
<v Kevin Bauer>Uh, whose job it is to control the
construction progress for the owner.

130
00:08:40.408 --> 00:08:44.568
<v Kevin Bauer>And, you know, um, construction is really
complicated because, you know, you have,

131
00:08:44.989 --> 00:08:50.348
<v Kevin Bauer>um, for example, equipment or outlets, for
example, in the floor, but you, you know,

132
00:08:50.419 --> 00:08:56.348
<v Kevin Bauer>you just can't control them if they are
built, uh, uh, like they should until the

133
00:08:56.348 --> 00:08:57.189
<v Kevin Bauer>floor is not there.

134
00:08:58.309 --> 00:09:03.940
<v Kevin Bauer>So, um, Dess which you guys have often a
hard time, it's, let's say, really

135
00:09:03.940 --> 00:09:08.020
<v Kevin Bauer>following the progress because the
contractors, they're also not, they're also quite

136
00:09:08.020 --> 00:09:13.340
<v Kevin Bauer>smart, and let's say, uh, uh, do the
things that's quick, that let's say, you often

137
00:09:13.340 --> 00:09:16.010
<v Kevin Bauer>afterwards cannot control everything,
yeah.

138
00:09:16.539 --> 00:09:20.820
<v Kevin Bauer>Did they really build like it was defined
in the contract, yeah?

139
00:09:21.520 --> 00:09:26.109
<v Kevin Bauer>And yeah, what we, and the, the, uh,
mobile scanning helped a lot because, you know,

140
00:09:26.229 --> 00:09:31.150
<v Kevin Bauer>as we indicated the scanning, the
construction progress there, the site supervision

141
00:09:31.150 --> 00:09:35.669
<v Kevin Bauer>could did not, let's say, didn't need to
be there all the time, yeah, or at a

142
00:09:35.669 --> 00:09:39.469
<v Kevin Bauer>specific time, yeah, we scanned it and
afterwards, they could, let's say, take the

143
00:09:39.469 --> 00:09:40.010
<v Kevin Bauer>scan.

144
00:09:40.559 --> 00:09:43.599
<v Kevin Bauer>And check the scan against the, the
contractor.

145
00:09:44.000 --> 00:09:49.280
<v Kevin Bauer>So through this day, it was easier for
them to do all the project management, the,

146
00:09:49.359 --> 00:09:56.280
<v Kevin Bauer>the tracking of the construction progress,
and And, um, then this lead in,

147
00:09:56.390 --> 00:10:00.349
<v Kevin Bauer>let's say, really good anti-claimage
because afterwards, we identified, for example,

148
00:10:00.440 --> 00:10:04.520
<v Kevin Bauer>that there weren't enough outlets and that
the documentation of the central tech

149
00:10:04.520 --> 00:10:11.280
<v Kevin Bauer>technical central units was, uh, not
correct, and we could use a 3D scan to, to,

150
00:10:11.599 --> 00:10:13.619
<v Kevin Bauer>yeah, to anticlaim management

151
00:10:14.119 --> 00:10:16.559
<v Kevin Bauer>and to get big money for the owner.

152
00:10:17.320 --> 00:10:21.960
<v John Lester>Yeah, right, so, so through that process,
as you say, you know, a site supervisor

153
00:10:21.960 --> 00:10:22.840
<v John Lester>can't be everywhere.

154
00:10:23.599 --> 00:10:27.960
<v John Lester>Someone who's responsible for checking the
quality can't, can't be at every single

155
00:10:27.960 --> 00:10:30.130
<v John Lester>step of every single discipline along the
way.

156
00:10:30.320 --> 00:10:34.559
<v John Lester>So if you disappear for a day or you're
somewhere else on site for a day, then

157
00:10:34.559 --> 00:10:39.159
<v John Lester>certainly the walls or the floor or the
ceiling go up, and what's behind them, maybe

158
00:10:39.159 --> 00:10:40.500
<v John Lester>you don't have the chance to see.

159
00:10:40.809 --> 00:10:44.500
<v John Lester>So with these 3D scans you're able to
collect more information.

160
00:10:44.869 --> 00:10:50.679
<v John Lester>And also set a staging, let's call it that
this scan must happen before the next

161
00:10:50.679 --> 00:10:53.719
<v John Lester>step comes along, and that gives you that
information.

162
00:10:54.830 --> 00:11:00.150
<v John Lester>So I can imagine that that would pay
dividends throughout that whole construction

163
00:11:00.150 --> 00:11:05.150
<v John Lester>phase right up until delivery day because
you have the chance to really look in

164
00:11:05.150 --> 00:11:11.669
<v John Lester>detail into every part of the building
that's scanned and perhaps in more detail

165
00:11:11.669 --> 00:11:14.719
<v John Lester>than you would be physically on site at
the time.

166
00:11:15.400 --> 00:11:21.469
<v John Lester>Once we get then to the The operation
phase, so the building is handed over,

167
00:11:22.890 --> 00:11:28.210
<v John Lester>the scans are then as part of the as built
drawings, you've constructed this, this

168
00:11:28.210 --> 00:11:33.799
<v John Lester>representation of the building as it's
delivered and through combining all of the

169
00:11:33.799 --> 00:11:36.169
<v John Lester>information you collect through the BIM
process, etc.

170
00:11:36.239 --> 00:11:36.609
<v John Lester>etc.

171
00:11:36.950 --> 00:11:41.690
<v John Lester>you, you end up with this, this set of
data that really represents the physical

172
00:11:41.690 --> 00:11:42.130
<v John Lester>building.

173
00:11:42.880 --> 00:11:43.619
<v John Lester>What happens next?

174
00:11:43.979 --> 00:11:48.000
<v John Lester>What are some of the other use cases and
some of the other values for the

175
00:11:48.000 --> 00:11:51.919
<v John Lester>stakeholders that are operating the
building, owning and operating and using that

176
00:11:51.919 --> 00:11:52.299
<v John Lester>building?

177
00:11:53.650 --> 00:11:56.479
<v Kevin Bauer>Yeah, you know, the cool thing is, um,
through this small person can we helped the

178
00:11:56.479 --> 00:11:59.869
<v Kevin Bauer>site separation really do a great job.

179
00:12:00.489 --> 00:12:06.729
<v Kevin Bauer>We brought in transparency and then the
contractors at the end really deliver api

180
00:12:06.729 --> 00:12:08.750
<v Kevin Bauer>data because they cannot hide.

181
00:12:09.330 --> 00:12:12.890
<v Kevin Bauer>And then the cool thing is, yeah, that
they again talk a little bit about the pain

182
00:12:12.890 --> 00:12:15.750
<v Kevin Bauer>point without this, uh, process.

183
00:12:16.010 --> 00:12:18.609
<v Kevin Bauer>It's like this that, um.

184
00:12:19.330 --> 00:12:25.169
<v Kevin Bauer>Um, the, the FM guys, yeah, they normally
come, come in into a into a project, let's

185
00:12:25.169 --> 00:12:27.250
<v Kevin Bauer>say, uh, after the building is finished,
yeah.

186
00:12:28.169 --> 00:12:34.330
<v Kevin Bauer>And you know, the, the contractors,
mechanical general contractor, whoever, their

187
00:12:34.330 --> 00:12:39.130
<v Kevin Bauer>main task is to say, RDC already on in the
horizon, uh, the, the construction

188
00:12:39.130 --> 00:12:40.450
<v Kevin Bauer>project will be finished soon.

189
00:12:40.530 --> 00:12:45.890
<v Kevin Bauer>Yeah, let's quickly do our stuff and then
run our way as quickly as possible, yeah,

190
00:12:46.289 --> 00:12:51.789
<v Kevin Bauer>that we do not get in contact with the FM
guy and then the FM guy comes in later.

191
00:12:53.020 --> 00:12:58.510
<v Kevin Bauer>And yeah, he has, let's say some orders of
documentation paper, and then he

192
00:12:58.510 --> 00:13:02.479
<v Kevin Bauer>identifies often not this documentation
doesn't reflect reality.

193
00:13:03.510 --> 00:13:10.020
<v Kevin Bauer>And then he, let's say has to do a lot of
freework or let's say, um, um, go through

194
00:13:10.020 --> 00:13:14.750
<v Kevin Bauer>all the material, check up if, how the
things work, is this really a speed this kind

195
00:13:14.750 --> 00:13:17.450
<v Kevin Bauer>of stuff, yeah, and, um, yeah.

196
00:13:18.390 --> 00:13:22.739
<v Kevin Bauer>And if we do our homework early on,
integrate 3D scanning, bring in transparency,

197
00:13:22.750 --> 00:13:27.710
<v Kevin Bauer>and get really, really good SB data, you
know, the FM doesn't need to do this job

198
00:13:27.710 --> 00:13:28.070
<v Kevin Bauer>again, yeah.

199
00:13:28.380 --> 00:13:35.030
<v Kevin Bauer>So the value is, uh, let's say we can save
time and, and money for the FM guy, yeah.

200
00:13:37.080 --> 00:13:38.900
<v Kevin Bauer>Yeah, already fits together.

201
00:13:39.440 --> 00:13:40.119
<v John Lester>Yeah, perfect.

202
00:13:40.359 --> 00:13:44.039
<v John Lester>And, and maybe a quick note before we move
on, you know, this is just that

203
00:13:44.039 --> 00:13:44.799
<v John Lester>individual example.

204
00:13:44.840 --> 00:13:48.409
<v John Lester>In general, we have a lot of great
contractors out there that do a lot of great

205
00:13:48.409 --> 00:13:51.880
<v John Lester>work, and, and I can imagine that this
information that you collect through the 3D

206
00:13:51.880 --> 00:13:56.200
<v John Lester>scanning can also be useful for them to
really verify and check their work along

207
00:13:56.200 --> 00:13:56.919
<v John Lester>that process.

208
00:13:57.979 --> 00:13:59.479
<v John Lester>So we have that scan.

209
00:13:59.559 --> 00:14:01.000
<v John Lester>We have the as-built documentation.

210
00:14:01.039 --> 00:14:03.919
<v John Lester>It really does reflect what is on site.

211
00:14:04.000 --> 00:14:07.880
<v John Lester>So this saves the facility manager a huge
amount of effort when he comes and takes

212
00:14:07.880 --> 00:14:09.619
<v John Lester>over through the operation phase.

213
00:14:10.159 --> 00:14:15.440
<v John Lester>How about the owners and the operators,
those that, you know, are responsible for

214
00:14:15.440 --> 00:14:21.119
<v John Lester>the building, that's their assets, and
they have to maintain and, and, you know, use

215
00:14:21.119 --> 00:14:24.940
<v John Lester>it to generate the revenue or the business
that they expect.

216
00:14:26.570 --> 00:14:31.929
<v Kevin Bauer>Yeah, um, for the owner, the, the, there's
also a big failure because, um, at the

217
00:14:31.929 --> 00:14:37.109
<v Kevin Bauer>end, you can use the 3D scan, uh, for
something called an indoor fuel from Navis,

218
00:14:37.179 --> 00:14:37.210
<v Kevin Bauer>yeah.

219
00:14:37.679 --> 00:14:43.250
<v Kevin Bauer>And also thank you for, uh, Navis to this
great product and which you use a lot.

220
00:14:44.119 --> 00:14:49.799
<v Kevin Bauer>And, um, yeah, the owner can use it this,
this indoor viewer which looks like a

221
00:14:49.799 --> 00:14:53.270
<v Kevin Bauer>Google Maps indoor also for marketing.

222
00:14:53.520 --> 00:14:57.880
<v Kevin Bauer>For example, if he has some tenants or he
wants to get new tenants, he, let's say

223
00:14:57.880 --> 00:15:03.400
<v Kevin Bauer>can show the people online, uh, guide them
like through the real building but it's

224
00:15:03.400 --> 00:15:04.000
<v Kevin Bauer>just Twitter.

225
00:15:04.830 --> 00:15:08.479
<v Kevin Bauer>In the 3, in the, in the viewer, you can
also measure, let's say, let's say for

226
00:15:08.479 --> 00:15:13.479
<v Kevin Bauer>example, how, how high is the, the room,
how bright is the room.

227
00:15:13.859 --> 00:15:14.969
<v Kevin Bauer>And all this kind of stuff.

228
00:15:15.380 --> 00:15:20.239
<v Kevin Bauer>So you say you can't do all the marketing
stuff a building owner needs to do today,

229
00:15:20.250 --> 00:15:23.619
<v Kevin Bauer>and he can also give it give access to the
tenants.

230
00:15:24.200 --> 00:15:29.640
<v Kevin Bauer>And then also, also the FM guys can use
this and really important in this, uh, in

231
00:15:29.640 --> 00:15:33.489
<v Kevin Bauer>the interviewer, it's also open to
integrate other, uh, data.

232
00:15:33.729 --> 00:15:37.770
<v Kevin Bauer>So for example, we integrate it in there,
um, data from our billing automation

233
00:15:37.770 --> 00:15:38.130
<v Kevin Bauer>system.

234
00:15:38.179 --> 00:15:41.429
<v Kevin Bauer>So you can look up in the in the
interviewer, which is web-based, which is really

235
00:15:41.429 --> 00:15:45.169
<v Kevin Bauer>easy to use the live data from the billing
automation systems.

236
00:15:45.289 --> 00:15:48.849
<v Kevin Bauer>So you can look up there and what's
current, the current value of the pump or what's

237
00:15:48.849 --> 00:15:51.299
<v Kevin Bauer>the current value of the, the heating
systems.

238
00:15:52.789 --> 00:15:57.109
<v John Lester>You're right, so then the owner gets this
asset, this information that doesn't just

239
00:15:57.109 --> 00:16:01.349
<v John Lester>go in a drawer and sit there, but it
really can be used for him as you, as you

240
00:16:01.349 --> 00:16:06.190
<v John Lester>describe, to represent their building
space, even to start to plan or think about

241
00:16:06.190 --> 00:16:10.510
<v John Lester>things, maybe work with an architect for a
fit out or many different use cases that

242
00:16:10.520 --> 00:16:13.030
<v John Lester>that that kind of information could be
useful.

243
00:16:13.469 --> 00:16:17.840
<v John Lester>And that last use case that you just just
described where all of a sudden we have a

244
00:16:17.840 --> 00:16:22.359
<v John Lester>space that not only can you navigate
through it, but it also represents or delivers

245
00:16:22.359 --> 00:16:27.989
<v John Lester>the live information that have been
collected by the management systems, you know,

246
00:16:28.039 --> 00:16:32.919
<v John Lester>all of a sudden this is starting to give
you real transparency on your building and

247
00:16:32.919 --> 00:16:37.760
<v John Lester>not just transparency right now, but then
also back historically to say, you know,

248
00:16:37.799 --> 00:16:41.570
<v John Lester>what happened in this space, you know,
what components were put in here, when were

249
00:16:41.570 --> 00:16:43.000
<v John Lester>they, where were they placed, etc.

250
00:16:44.190 --> 00:16:47.559
<v John Lester>Anyone else on your list that you found
through this experience that really

251
00:16:47.559 --> 00:16:53.440
<v John Lester>benefited from, from bringing 3D scanning
in as such an integral part of that

252
00:16:53.440 --> 00:16:54.159
<v John Lester>delivery phase?

253
00:16:57.080 --> 00:17:02.929
<v Kevin Bauer>Um, yeah, but, I think it's, it's
generally, you could say nearly everybody benefits

254
00:17:02.929 --> 00:17:03.739
<v Kevin Bauer>a little bit, yeah.

255
00:17:04.170 --> 00:17:07.739
<v Kevin Bauer>But the most important, uh, for example,
also the project managers and this kind of

256
00:17:07.739 --> 00:17:09.170
<v Kevin Bauer>stuff in the construction phase, yeah.

257
00:17:09.530 --> 00:17:14.810
<v Kevin Bauer>But in general, let's say it's really
important to highlight that this, um, this

258
00:17:14.810 --> 00:17:19.969
<v Kevin Bauer>mobile 3D scanning is something, let's
say, which delivers value to many

259
00:17:19.969 --> 00:17:23.550
<v Kevin Bauer>stakeholders for like the site separation,
also the contractors.

260
00:17:24.369 --> 00:17:29.319
<v Kevin Bauer>And then the FM guys, the billing owners,
the, the tenants, it's really important

261
00:17:29.319 --> 00:17:36.319
<v Kevin Bauer>that we, let's say, share also the values
and not that just 11

262
00:17:36.319 --> 00:17:38.900
<v Kevin Bauer>stakeholder does, just does it for
himself, yeah.

263
00:17:39.170 --> 00:17:45.420
<v Kevin Bauer>It's really important to share it because
let's say, if you share the costs, then

264
00:17:45.420 --> 00:17:49.180
<v Kevin Bauer>the return of invest for the values you
get is much higher.

265
00:17:49.800 --> 00:17:49.810
<v John Lester>Yeah.

266
00:17:51.420 --> 00:17:55.810
<v John Lester>No, that's a good point which I like
because it, it goes in line with, with the

267
00:17:55.810 --> 00:17:59.170
<v John Lester>values or the core of the BIM process in
general as well.

268
00:17:59.420 --> 00:18:04.780
<v John Lester>It's that collaboration, it's the sharing
and the accessibility to data, and it's

269
00:18:04.780 --> 00:18:08.770
<v John Lester>the, the single source of truth, you know,
the, the, the fact that everyone's

270
00:18:08.770 --> 00:18:12.390
<v John Lester>working off the same information which can
deliver so many benefits, not just

271
00:18:12.390 --> 00:18:17.150
<v John Lester>through that, that delivery phase, but
then also moving into the operational phase.

272
00:18:18.979 --> 00:18:23.119
<v John Lester>Maybe my last question on this topic, you
know, you went through this process.

273
00:18:23.500 --> 00:18:30.199
<v John Lester>You did 18 different 3D scans throughout
the building in this particular example.

274
00:18:30.979 --> 00:18:35.489
<v John Lester>It delivered benefits for the, for the
construction company, for the owner.

275
00:18:35.579 --> 00:18:40.609
<v John Lester>In the end, you use it through the
operational phase for facility managers, for the

276
00:18:40.609 --> 00:18:41.410
<v John Lester>operational teams.

277
00:18:41.979 --> 00:18:47.089
<v John Lester>What, what would your suggestion be if you
were talking to To a consultant, a

278
00:18:47.089 --> 00:18:51.750
<v John Lester>company, a construction group of
stakeholders that were about to kick off a project,

279
00:18:51.859 --> 00:18:56.489
<v John Lester>and, and they were thinking about bringing
3D scanning in as one of these, these

280
00:18:56.489 --> 00:19:00.410
<v John Lester>additional disciplines as really a core
part of the delivery phase and then moving

281
00:19:00.410 --> 00:19:01.689
<v John Lester>into the operational phase.

282
00:19:02.079 --> 00:19:06.130
<v John Lester>What would your suggestion be or a couple
of notes that you discovered and learned

283
00:19:06.130 --> 00:19:07.109
<v John Lester>along this process?

284
00:19:08.890 --> 00:19:12.250
<v Kevin Bauer>Um, yeah, at first we did, we did at the
beginning, yeah.

285
00:19:12.609 --> 00:19:18.689
<v Kevin Bauer>Think again, think about, let's say, what
are Uh, what kind of building you have and

286
00:19:18.689 --> 00:19:22.599
<v Kevin Bauer>what are the, uh, what's the strategy in
the building operations?

287
00:19:22.650 --> 00:19:23.959
<v Kevin Bauer>And what's important in your building?

288
00:19:24.010 --> 00:19:25.770
<v Kevin Bauer>Is it, uh, technical building operations?

289
00:19:25.810 --> 00:19:27.469
<v Kevin Bauer>Is it energy efficiency?

290
00:19:27.760 --> 00:19:34.680
<v Kevin Bauer>And then think about how, which use cases,
twin use cases using beam IOT

291
00:19:34.680 --> 00:19:40.359
<v Kevin Bauer>mobile skating, whatever are important to
leverage or support your strategy.

292
00:19:40.839 --> 00:19:46.560
<v Kevin Bauer>If you know this, yeah, then you can think
back how, what kind of data and what kind

293
00:19:46.560 --> 00:19:50.160
<v Kevin Bauer>of stuff you need to do in your
construction process, yeah.

294
00:19:50.479 --> 00:19:52.619
<v Kevin Bauer>So at first when you think about this
operational thing.

295
00:19:53.160 --> 00:19:58.589
<v Kevin Bauer>And then think about step two, what you
need in the construction phase, yeah,

296
00:19:59.000 --> 00:20:02.119
<v Kevin Bauer>because then let's say, sometimes, you
know, it's also about prioritization.

297
00:20:02.239 --> 00:20:04.260
<v Kevin Bauer>What kind, what is really important for
you, yeah?

298
00:20:04.359 --> 00:20:09.140
<v Kevin Bauer>Do you want to do a, a full-fledged mobile
scaling like we did, full integration,

299
00:20:09.439 --> 00:20:14.569
<v Kevin Bauer>uh, probably you need for you, the, the,
the HVAC system is the most important,

300
00:20:14.699 --> 00:20:17.400
<v Kevin Bauer>yeah, because, you know, you have some
huge cases which require this data.

301
00:20:17.589 --> 00:20:21.560
<v Kevin Bauer>Yeah then really focus on getting all the
HVAC data, yeah.

302
00:20:22.329 --> 00:20:23.930
<v Kevin Bauer>Uh, through the mobile scanning, yeah.

303
00:20:24.489 --> 00:20:26.109
<v Kevin Bauer>And then let's say, so really focused.

304
00:20:26.130 --> 00:20:31.479
<v Kevin Bauer>And the second thing is, uh, the, the 2nd
and 3rd thing is then it's really, think,

305
00:20:31.599 --> 00:20:36.250
<v Kevin Bauer>if you know the use cases, then also think
about integrating all the stakeholders.

306
00:20:36.339 --> 00:20:36.489
<v Kevin Bauer>Yeah.

307
00:20:36.579 --> 00:20:41.369
<v Kevin Bauer>So, uh, talk to the consultants, site
supervision, talk to the contractors, talk to

308
00:20:41.369 --> 00:20:46.300
<v Kevin Bauer>the FM guys, the, the owner, the project
managers, the tenants, and think about the,

309
00:20:46.890 --> 00:20:48.060
<v Kevin Bauer>how to share the value.

310
00:20:48.650 --> 00:20:52.989
<v Kevin Bauer>Because if you share the value of the
mobile scanning, Then it's, uh, much the

311
00:20:52.989 --> 00:20:56.410
<v Kevin Bauer>return of investors, is, is much easier to
get, yeah.

312
00:20:57.449 --> 00:20:58.010
<v John Lester>Understand.

313
00:20:58.170 --> 00:21:03.329
<v John Lester>So, so like, like always, make sure you
put in the thought to decide what you want

314
00:21:03.329 --> 00:21:07.569
<v John Lester>to achieve, um, so that, uh, you know, you
have a direction and you have a place to

315
00:21:07.569 --> 00:21:08.150
<v John Lester>get to.

316
00:21:09.359 --> 00:21:14.060
<v John Lester>then focus on those spaces so you can
really control the effort, but then also make

317
00:21:14.060 --> 00:21:15.780
<v John Lester>sure you do collect the information you
need.

318
00:21:15.819 --> 00:21:18.760
<v John Lester>And then the last one that you mentioned
there, which is really the important one,

319
00:21:19.140 --> 00:21:23.300
<v John Lester>bring everyone on board, find the value
for every one of those stakeholders and

320
00:21:23.300 --> 00:21:27.109
<v John Lester>ensure that the content and everything
that's discovered is shared effectively

321
00:21:27.109 --> 00:21:27.920
<v John Lester>throughout the group.

322
00:21:28.339 --> 00:21:29.290
<v John Lester>Kevin, thank you so much.

323
00:21:29.579 --> 00:21:32.959
<v John Lester>A great conversation and a really great
topic, which is something I think that we

324
00:21:32.959 --> 00:21:35.859
<v John Lester>will start to see more and more hopefully
within our industry.

325
00:21:36.020 --> 00:21:36.280
<v John Lester>So.

326
00:21:36.660 --> 00:21:38.869
<v John Lester>So thanks for the discussion and thank you
for your time.

327
00:21:39.180 --> 00:21:39.589
<v John Lester>You're welcome.

328
00:21:39.760 --> 00:21:40.709
<v Kevin Bauer>I'm really happy to be here.

329
00:21:41.959 --> 00:21:44.069
<v John Lester>I, I hope it's not the last time we have a
discussion.

330
00:21:44.079 --> 00:21:48.199
<v John Lester>I get the feeling there's, there's more
and more that we can, we can talk about when

331
00:21:48.199 --> 00:21:53.680
<v John Lester>we, when we start to look at this
application of the BIMM process, uh, the, the

332
00:21:53.680 --> 00:22:00.430
<v John Lester>accuracy and, and the additional, uh,
Information that we can collect through that

333
00:22:00.430 --> 00:22:05.890
<v John Lester>process that can be used and you add
additional value and continue to add value

334
00:22:05.890 --> 00:22:08.829
<v John Lester>through that operation phase and then some
of these kinds of topics like 3D

335
00:22:08.829 --> 00:22:14.030
<v John Lester>scanning, which is something that we see
not as much as we could do and as the

336
00:22:14.030 --> 00:22:17.939
<v John Lester>technology becomes more powerful, I think
it's a great thing to To really discuss

337
00:22:17.939 --> 00:22:24.020
<v John Lester>about how that can change the way that we
do some things and if that improves the

338
00:22:24.020 --> 00:22:28.780
<v John Lester>quality of as-built drawings and delivers
information that enables us to operate

339
00:22:28.780 --> 00:22:31.880
<v John Lester>more effectively, then this is a win
already for all involved.

340
00:22:32.469 --> 00:22:33.609
<v John Lester>So thank you again Kevin.

341
00:22:33.979 --> 00:22:37.219
<v John Lester>Thank you to everyone that's listening to
us today.

342
00:22:37.550 --> 00:22:39.619
<v John Lester>Remember to like, share, comment this
episode.

343
00:22:39.739 --> 00:22:43.739
<v John Lester>Subscribe to us wherever you're listening
to us, and keep your eye out for more

344
00:22:43.739 --> 00:22:48.780
<v John Lester>discussions together with Kevin on the
topic of BIMM and Digital Twin, but also

345
00:22:48.780 --> 00:22:49.619
<v John Lester>other new episodes.

346
00:22:49.660 --> 00:22:53.300
<v John Lester>We have one every week, so keep your eye
open, and we'll talk to you very soon.

347
00:22:53.459 --> 00:22:53.920
<v John Lester>Thank you.