WEBVTT
Language: en-US

1
00:00:10.739 --> 00:00:12.890
<v Jon Lester>Hello and welcome to Buildings of
Tomorrow.

2
00:00:13.060 --> 00:00:17.100
<v Jon Lester>My name is Jon Lester, and in today's
episode we are talking about gaining

3
00:00:17.100 --> 00:00:21.229
<v Jon Lester>operational efficiencies for buildings,
leveraging BIM and digital twin technology.

4
00:00:21.389 --> 00:00:25.659
<v Jon Lester>I'm joined today by Kevin Bauer, who is
the lead for BIM and digital twin at Siemens

5
00:00:25.659 --> 00:00:27.030
<v Jon Lester>Smart-Infrastructure in Europe.

6
00:00:27.149 --> 00:00:28.670
<v Jon Lester>Kevin, thank you so much for joining us.

7
00:00:29.770 --> 00:00:30.100
<v Kevin Bauer>We came.

8
00:00:31.520 --> 00:00:32.720
<v Jon Lester>Um, let's

9
00:00:32.720 --> 00:00:33.360
<v Kevin Bauer>start at the start.

10
00:00:33.509 --> 00:00:37.680
<v Jon Lester>You know, BIMM and digital twin are both
topics we hear a lot about in our industry.

11
00:00:37.799 --> 00:00:41.159
<v Jon Lester>For the sake of this discussion, and it is
the first discussion we're going to have,

12
00:00:41.240 --> 00:00:44.560
<v Jon Lester>I think there's a lot of things to cover,
so we'll do a couple of different episodes

13
00:00:44.560 --> 00:00:45.069
<v Jon Lester>along the way.

14
00:00:45.150 --> 00:00:48.740
<v Jon Lester>But what do we mean when we say digital
twin from your perspective?

15
00:00:50.389 --> 00:00:56.549
<v Kevin Bauer>Digital twin is really the combination of
static data, and also sensor technologies,

16
00:00:56.669 --> 00:01:01.270
<v Kevin Bauer>so data from the IoT from the billing
management systems like fire safety, security,

17
00:01:01.389 --> 00:01:02.180
<v Kevin Bauer>billing automation.

18
00:01:02.229 --> 00:01:04.970
<v Kevin Bauer>It's really the combination of these two
technologies.

19
00:01:06.169 --> 00:01:10.650
<v Jon Lester>And, and because it's a combination, is
that, is that what brings these

20
00:01:10.650 --> 00:01:14.199
<v Jon Lester>efficiencies, because, you know, in
today's discussion, we're going to talk a little

21
00:01:14.199 --> 00:01:16.660
<v Jon Lester>bit about why, and why is it important?

22
00:01:17.250 --> 00:01:19.930
<v Jon Lester>And maybe you could give us a bit of a of
a of a hint.

23
00:01:20.010 --> 00:01:23.970
<v Jon Lester>Why is it important that BIM and Digital
Twin is there to help us gain those

24
00:01:23.970 --> 00:01:24.750
<v Jon Lester>efficiencies?

25
00:01:26.260 --> 00:01:31.550
<v Kevin Bauer>You don't the big efficiencies you gain in
the operation phase if you really combine

26
00:01:31.550 --> 00:01:36.379
<v Kevin Bauer>the beam data, which you get from the
planning phase or the construction phase until

27
00:01:36.389 --> 00:01:39.970
<v Kevin Bauer>the operation phase, and then you combine
it with the operational data from the home

28
00:01:39.970 --> 00:01:45.599
<v Kevin Bauer>automation from the primary energy systems
like Uh, presence detection, humidity,

29
00:01:45.800 --> 00:01:51.040
<v Kevin Bauer>CO2 level, and if you combined in this
data, you can enable new use cases like space

30
00:01:51.040 --> 00:01:56.029
<v Kevin Bauer>analytics, 3D based incident management,
better energy efficiency.

31
00:01:56.080 --> 00:02:00.199
<v Kevin Bauer>So it's really all about increasing the
operational efficiency for building from an

32
00:02:00.199 --> 00:02:05.000
<v Kevin Bauer>energetic perspective, from a facility
management perspective, and from better space

33
00:02:05.000 --> 00:02:05.580
<v Kevin Bauer>usage.

34
00:02:06.199 --> 00:02:07.019
<v Jon Lester>I understand.

35
00:02:07.279 --> 00:02:13.339
<v Jon Lester>And uh You know, for me that's a really
important aspect because too often we talk

36
00:02:13.339 --> 00:02:17.020
<v Jon Lester>just about BIM in the construction or the
planning phase.

37
00:02:17.100 --> 00:02:22.660
<v Jon Lester>We talk too much about how, you know, the
digital twin is useful, but, you know, we

38
00:02:22.660 --> 00:02:27.419
<v Jon Lester>have to be able to, to get there, you
know, and, and if you had one hint, because,

39
00:02:27.460 --> 00:02:30.179
<v Jon Lester>you know, in our, in our following
discussions, we're going to talk a few different

40
00:02:30.179 --> 00:02:30.300
<v Jon Lester>things.

41
00:02:30.380 --> 00:02:34.080
<v Jon Lester>We're going to use some real world
examples that that you've, you've gone through

42
00:02:34.080 --> 00:02:38.139
<v Jon Lester>yourself and your team, you know, what's,
what's really the important step to bring

43
00:02:38.139 --> 00:02:39.080
<v Jon Lester>these two.

44
00:02:39.470 --> 00:02:41.309
<v Jon Lester>Different technologies, let's call it
together.

45
00:02:41.389 --> 00:02:46.149
<v Jon Lester>How do we get BIM and combine it with this
stuff to create that digital twin in the

46
00:02:46.149 --> 00:02:46.610
<v Jon Lester>future?

47
00:02:47.729 --> 00:02:51.979
<v Kevin Bauer>Yeah, I think it's really important if
you, uh, design and build a buil uh design

48
00:02:51.979 --> 00:02:56.139
<v Kevin Bauer>and build a building, yeah, also really
think about in the early phase of how you

49
00:02:56.139 --> 00:02:57.460
<v Kevin Bauer>want to operate the building, yeah.

50
00:02:57.860 --> 00:03:01.000
<v Kevin Bauer>And there, in the operational phase, all
the sensor technology.

51
00:03:01.699 --> 00:03:04.350
<v Kevin Bauer>is really important because you have a lot
of maintenance.

52
00:03:04.490 --> 00:03:08.850
<v Kevin Bauer>It's responsible for the energy efficiency
and therefore it's also really important

53
00:03:08.850 --> 00:03:13.729
<v Kevin Bauer>if you want to come to a digital twin to
also do a bin-based design of the billing

54
00:03:13.729 --> 00:03:16.770
<v Kevin Bauer>automation system, fire safety system,
security system.

55
00:03:17.009 --> 00:03:18.210
<v Jon Lester>We're certainly going to talk through
them.

56
00:03:18.279 --> 00:03:21.369
<v Jon Lester>It's, you know, the digital twin is really
this combination of the information

57
00:03:21.369 --> 00:03:26.089
<v Jon Lester>collected during the bIMM phase with the
information and the live data that's then

58
00:03:26.089 --> 00:03:27.669
<v Jon Lester>collected during the operation phase.

59
00:03:28.850 --> 00:03:33.660
<v Jon Lester>It's important for us because this insight
really can deliver some of those, those

60
00:03:33.660 --> 00:03:38.490
<v Jon Lester>new benefits that deliver efficiency like
you discussed really quickly, and the last

61
00:03:38.490 --> 00:03:41.259
<v Jon Lester>phase, of course, you need to know where
you're trying to get to because if you

62
00:03:41.259 --> 00:03:43.940
<v Jon Lester>don't think about how you want to operate
a building while you're going through the

63
00:03:43.940 --> 00:03:48.130
<v Jon Lester>planning process, it makes everything much
more difficult in the next phase and the

64
00:03:48.130 --> 00:03:48.619
<v Jon Lester>next phase.

65
00:03:49.490 --> 00:03:53.910
<v Jon Lester>Let's, uh, let's jump quickly into, uh,
into the why.

66
00:03:54.130 --> 00:04:00.050
<v Jon Lester>Um, you know, there are, there are
thousands, hundreds of thousands of buildings

67
00:04:00.050 --> 00:04:00.929
<v Jon Lester>around the globe.

68
00:04:01.289 --> 00:04:04.289
<v Jon Lester>Uh, we know we need to operate them
better.

69
00:04:04.490 --> 00:04:06.830
<v Jon Lester>How can BIM and Digital Twin help us
achieve that?

70
00:04:09.360 --> 00:04:12.160
<v Kevin Bauer>I think, you know, uh, a really important
thing is, you know, we're in the

71
00:04:12.160 --> 00:04:16.959
<v Kevin Bauer>construction business, and, you know,
construction business is one, port, let's say,

72
00:04:17.279 --> 00:04:19.799
<v Kevin Bauer>one name you can say to the construction
business is like Caltech.

73
00:04:20.920 --> 00:04:24.220
<v Kevin Bauer>And therefore, you know, we still have the
same productivity like 20 years ago.

74
00:04:24.519 --> 00:04:28.339
<v Kevin Bauer>At the same time, the automotive industry
increased its productivity dramatically,

75
00:04:28.429 --> 00:04:29.420
<v Kevin Bauer>but we're the same level.

76
00:04:30.160 --> 00:04:35.279
<v Kevin Bauer>And yeah, beam on the one hand is really
one thing to help us getting the efficiency

77
00:04:35.279 --> 00:04:37.140
<v Kevin Bauer>in general, like the automotive industry.

78
00:04:37.660 --> 00:04:42.059
<v Kevin Bauer>But next to this, it's also really
important to not just think about how to

79
00:04:42.059 --> 00:04:42.890
<v Kevin Bauer>construct a building.

80
00:04:42.980 --> 00:04:46.899
<v Kevin Bauer>It's also about thinking why we should
operate buildings really much more

81
00:04:46.899 --> 00:04:47.519
<v Kevin Bauer>efficiently.

82
00:04:47.940 --> 00:04:53.100
<v Kevin Bauer>Thinking about the Green Deal in the year
of 2050, you know, buildings play a

83
00:04:53.100 --> 00:04:53.820
<v Kevin Bauer>crucial role.

84
00:04:53.980 --> 00:04:59.410
<v Kevin Bauer>Like for example, 38% of all the CO2
emissions are generated by buildings.

85
00:05:00.000 --> 00:05:06.779
<v Kevin Bauer>37% of the waste of buildings, 37% of the
uh

86
00:05:06.779 --> 00:05:12.880
<v Kevin Bauer>material becomes waste, and 55% of the
facility maintenance programs are fixed when

87
00:05:12.880 --> 00:05:13.359
<v Kevin Bauer>it breaks.

88
00:05:14.059 --> 00:05:17.869
<v Kevin Bauer>And you know, if you want to reach a Green
Deal, we really have to work on this.

89
00:05:18.769 --> 00:05:24.559
<v Jon Lester>Yeah, and just for those listening, the
Green Deal is a, is an EU-based energy

90
00:05:24.559 --> 00:05:29.839
<v Jon Lester>efficiency and sustainability, you know,
almost, let's call it a regulation, you

91
00:05:29.839 --> 00:05:36.040
<v Jon Lester>know, a goal for the EU to really reach
some quite significant savings across many

92
00:05:36.040 --> 00:05:42.399
<v Jon Lester>different parts of, of the company, but
across the organization, sorry, but you know

93
00:05:42.399 --> 00:05:45.179
<v Jon Lester>this building operation is a really key
part of that, correct?

94
00:05:45.940 --> 00:05:46.899
<v Kevin Bauer>Yeah, it's really crucial.

95
00:05:47.059 --> 00:05:53.179
<v Kevin Bauer>You know, if we don't, uh, correctly, um,
um, operate our buildings, they need much

96
00:05:53.179 --> 00:05:58.709
<v Kevin Bauer>more CO2 CO2 and on the other hand, we
don't use our resources efficiently.

97
00:05:59.350 --> 00:06:04.269
<v Kevin Bauer>And you know, I think you, when you go
through the news now, all the, uh, everything

98
00:06:04.269 --> 00:06:08.910
<v Kevin Bauer>gets more expensive because, you know, the
resources on our planet are fixed, you

99
00:06:08.910 --> 00:06:12.269
<v Kevin Bauer>know, we can't make more of them, and now
we should, we are really at the phase

100
00:06:12.269 --> 00:06:17.269
<v Kevin Bauer>where we should reduce the, the
temperature, the increasing of the temperature and

101
00:06:17.269 --> 00:06:22.809
<v Kevin Bauer>also think about how we, uh, use, uh, the
material, what we need in buildings.

102
00:06:23.510 --> 00:06:23.989
<v Jon Lester>Understand.

103
00:06:24.619 --> 00:06:28.109
<v Jon Lester>And it's a discussion which is a good one,
and it's not the same, the first time

104
00:06:28.109 --> 00:06:32.470
<v Jon Lester>we've talked about sustainability in this
podcast, in this show, but what's

105
00:06:32.470 --> 00:06:36.790
<v Jon Lester>interesting for us is, is in this
particular discussion, how do we get BIM and

106
00:06:36.790 --> 00:06:41.320
<v Jon Lester>digital twin perspective, because, you
know, it really does offer capabilities and

107
00:06:41.320 --> 00:06:44.910
<v Jon Lester>some of the values that you discussed
before, which we're not able to do today with

108
00:06:44.910 --> 00:06:46.329
<v Jon Lester>a more traditional approach.

109
00:06:46.790 --> 00:06:50.829
<v Jon Lester>But let's talk a little bit about how
there's, there's a process that we have to go

110
00:06:50.829 --> 00:06:50.950
<v Jon Lester>through.

111
00:06:51.309 --> 00:06:54.450
<v Jon Lester>There have to be Um, some changes to what
we do.

112
00:06:54.720 --> 00:06:58.899
<v Jon Lester>Uh, do you have an example or can you talk
us through a little bit?

113
00:07:00.160 --> 00:07:02.079
<v Jon Lester>We know we want to do it, we want to
achieve it.

114
00:07:02.309 --> 00:07:03.279
<v Jon Lester>Uh, how do we go about it?

115
00:07:03.359 --> 00:07:05.600
<v Jon Lester>You know, what, what are some of the steps
that we need to undertake?

116
00:07:06.989 --> 00:07:11.489
<v Kevin Bauer>Yeah, I can, uh, guide you through a real
project where we did this.

117
00:07:11.500 --> 00:07:17.309
<v Kevin Bauer>It was, uh, uh, uh, R&amp;D project of the
Vienna Business Agency together with Siemens

118
00:07:17.309 --> 00:07:18.940
<v Kevin Bauer>and the Vienna Distributed systems.

119
00:07:19.350 --> 00:07:23.570
<v Kevin Bauer>the technology where I was uh the manager
and project, uh, project leader where we,

120
00:07:23.869 --> 00:07:30.029
<v Kevin Bauer>let's see, we analyzed how to design,
build and operate buildings differently

121
00:07:30.029 --> 00:07:31.709
<v Kevin Bauer>because today we have this big problems,
sir.

122
00:07:32.220 --> 00:07:37.359
<v Kevin Bauer>And the first thing which is really
important is that Before we start to design and

123
00:07:37.359 --> 00:07:42.079
<v Kevin Bauer>build a building, we really have to think
about on how we want to operate the

124
00:07:42.079 --> 00:07:42.540
<v Kevin Bauer>building.

125
00:07:42.959 --> 00:07:45.279
<v Kevin Bauer>And what are, let's say, what is for this
kind of building?

126
00:07:45.359 --> 00:07:48.839
<v Kevin Bauer>Is it a hospital or is it an industry
building or is it office building?

127
00:07:49.160 --> 00:07:54.320
<v Kevin Bauer>What kind of use cases or targets you have
in the operation of the building?

128
00:07:54.519 --> 00:07:59.600
<v Kevin Bauer>And then if you have these targets, then
you drill down how you decide, how you

129
00:07:59.600 --> 00:08:02.529
<v Kevin Bauer>build it, what kind of technology you have
to, you need to have there.

130
00:08:02.760 --> 00:08:04.480
<v Kevin Bauer>So it's really about at the beginning.

131
00:08:04.559 --> 00:08:05.309
<v Kevin Bauer>First step is.

132
00:08:06.390 --> 00:08:11.950
<v Kevin Bauer>Thinking differently about how we're
thinking about the billing as a product, be

133
00:08:11.950 --> 00:08:16.820
<v Kevin Bauer>really customer centric or not just design
and build and then yet the operation will

134
00:08:16.820 --> 00:08:17.609
<v Kevin Bauer>come afterwards, yeah.

135
00:08:18.679 --> 00:08:22.959
<v Jon Lester>And that's a big shift, isn't it, because
even if we're building a building and we

136
00:08:22.959 --> 00:08:25.640
<v Jon Lester>know that it's going to be a hospital or
we know it's going to be an office

137
00:08:25.640 --> 00:08:30.480
<v Jon Lester>building, it's not very often the actual,
the conversation happens with the people

138
00:08:30.480 --> 00:08:34.640
<v Jon Lester>operating it, and you're setting things
like you're discussing KPIs, you know,

139
00:08:34.960 --> 00:08:40.039
<v Jon Lester>expectations on how it should operate, you
know, down to the level of workflows,

140
00:08:40.200 --> 00:08:45.640
<v Jon Lester>and, you know, what are the things that
need to be, need to be achieved on a daily

141
00:08:45.640 --> 00:08:46.020
<v Jon Lester>basis.

142
00:08:46.609 --> 00:08:48.340
<v Jon Lester>How, how was that conversation?

143
00:08:48.539 --> 00:08:52.539
<v Jon Lester>How did you get that information and that
insight from, from all the different

144
00:08:52.539 --> 00:08:55.039
<v Jon Lester>stakeholders across this, this example?

145
00:08:56.109 --> 00:09:01.729
<v Kevin Bauer>Yeah, you know, it's really about in early
phase sitting together with the heads,

146
00:09:02.070 --> 00:09:04.349
<v Kevin Bauer>that's the ones who are operating the
buildings.

147
00:09:04.429 --> 00:09:08.750
<v Kevin Bauer>So for example, in a hospital, we talking
to the COO or the head of facility

148
00:09:08.750 --> 00:09:12.070
<v Kevin Bauer>management and asking them, hey, what are
your problems today?

149
00:09:12.650 --> 00:09:14.799
<v Kevin Bauer>What kind of inefficiencies do you have
here?

150
00:09:14.880 --> 00:09:19.780
<v Kevin Bauer>And then, for example, we identified in a
hospital, it's really a lot about how to

151
00:09:20.390 --> 00:09:25.200
<v Kevin Bauer>increase the operational, uh, facility
management, because imagine a hospital is

152
00:09:25.200 --> 00:09:31.669
<v Kevin Bauer>opened 24 hours, 7 days a week, 7 days, 7
days a week, 365 days a year,

153
00:09:31.679 --> 00:09:33.890
<v Kevin Bauer>and for the next 50 years, yeah?

154
00:09:34.320 --> 00:09:39.440
<v Kevin Bauer>And, you know, if we can reduce for them,
the, the alarm management, for example, if

155
00:09:39.440 --> 00:09:43.960
<v Kevin Bauer>there is an alarm, and we can help them
identify this alarm quick and resolving it,

156
00:09:44.349 --> 00:09:47.890
<v Kevin Bauer>this is a business outcome, which is
really quantifiable.

157
00:09:48.239 --> 00:09:53.599
<v Kevin Bauer>And then let's say they can use the, the,
the stuff much better or second use case,

158
00:09:53.669 --> 00:09:58.479
<v Kevin Bauer>uh, topic in hospitals is, you know, they
have a lot of staff, medical staff and

159
00:09:58.479 --> 00:09:59.119
<v Kevin Bauer>nurses.

160
00:09:59.789 --> 00:10:03.799
<v Kevin Bauer>And they also often said that you, they
don't really know where is the next medical

161
00:10:03.799 --> 00:10:07.080
<v Kevin Bauer>equipment or they don't know where the
next doctor is.

162
00:10:07.159 --> 00:10:10.799
<v Kevin Bauer>Yeah, and for them, um, asset tracking is
really important.

163
00:10:10.880 --> 00:10:17.159
<v Kevin Bauer>And if you then have these use cases based
on real problems, then you need to define

164
00:10:17.159 --> 00:10:22.960
<v Kevin Bauer>them and then think about how, how we have
to build and design the building or

165
00:10:22.960 --> 00:10:26.960
<v Kevin Bauer>design and build the building, and which
kind of data do we need to come to these

166
00:10:26.960 --> 00:10:27.739
<v Kevin Bauer>use cases.

167
00:10:28.239 --> 00:10:33.239
<v Kevin Bauer>So for example, in this When you think
about this, uh, uh, operational FM use case,

168
00:10:33.359 --> 00:10:35.599
<v Kevin Bauer>we need to have a beam based management
station.

169
00:10:36.419 --> 00:10:41.630
<v Kevin Bauer>And for asset tracking, we need to have
IoT sensors in there which enable this asset

170
00:10:41.630 --> 00:10:42.090
<v Kevin Bauer>tracking.

171
00:10:42.940 --> 00:10:45.719
<v Kevin Bauer>So in this early phase, we think about
these use cases.

172
00:10:46.359 --> 00:10:51.409
<v Kevin Bauer>And then, then if you have these use
cases, we need to find them in an, in asset

173
00:10:51.409 --> 00:10:57.260
<v Kevin Bauer>information requirements concerning ISO
19,650, and then you can start the designing

174
00:10:57.719 --> 00:10:59.580
<v Kevin Bauer>of the building, yeah, but this is the
first step.

175
00:11:01.489 --> 00:11:06.010
<v Jon Lester>I, uh, you just mentioned a couple of
pieces of information that I remember from my

176
00:11:06.010 --> 00:11:10.250
<v Jon Lester>BIM training, and I forgot to mention at
the start that you're a certified building

177
00:11:10.250 --> 00:11:12.440
<v Jon Lester>smart trainer, and I can see it working
already.

178
00:11:12.500 --> 00:11:13.510
<v Jon Lester>I like it.

179
00:11:14.510 --> 00:11:19.289
<v Jon Lester>Now, that's really important because I
think, you know, it's not unusual for us to

180
00:11:19.289 --> 00:11:23.659
<v Jon Lester>think today about how is a building going
to be used, but maybe some of the problems

181
00:11:23.729 --> 00:11:27.969
<v Jon Lester>or one of the things that you demonstrate
and discuss here is that You take

182
00:11:27.969 --> 00:11:31.419
<v Jon Lester>something really functional and
operational, and you don't lose the connection when

183
00:11:31.419 --> 00:11:33.299
<v Jon Lester>you bring it back to the design.

184
00:11:33.419 --> 00:11:37.820
<v Jon Lester>You don't just say, OK, to do this we need
this technology, and then, and then you

185
00:11:37.820 --> 00:11:38.659
<v Jon Lester>lose that connection.

186
00:11:38.780 --> 00:11:45.020
<v Jon Lester>You know, it's part of that design process
also connected to the actual operational

187
00:11:45.020 --> 00:11:46.440
<v Jon Lester>technologies behind it.

188
00:11:47.619 --> 00:11:50.179
<v Jon Lester>So we go through this process where we
talked about planning, what happens when we

189
00:11:50.179 --> 00:11:51.320
<v Jon Lester>get to then construction.

190
00:11:51.409 --> 00:11:53.619
<v Jon Lester>So we've got a, we have a BIM model.

191
00:11:53.780 --> 00:11:57.909
<v Jon Lester>We have a detailed BIM model that really
Gives us all the information, not just

192
00:11:57.909 --> 00:12:01.070
<v Jon Lester>about the concrete, not just about the
glass, but also about the operational

193
00:12:01.070 --> 00:12:03.549
<v Jon Lester>technologies down to the sensors in some
cases.

194
00:12:03.950 --> 00:12:07.669
<v Jon Lester>What happens next when we go on site, we
break ground and we start to dig a hole?

195
00:12:08.000 --> 00:12:08.150
<v Jon Lester>Yeah,

196
00:12:08.369 --> 00:12:12.229
<v Kevin Bauer>you know, just some words again on the
design process, I forgot to say this, it's

197
00:12:12.229 --> 00:12:16.789
<v Kevin Bauer>really important to also design the
billing automation system, so all the

198
00:12:16.789 --> 00:12:22.719
<v Kevin Bauer>firetectors, security cameras, sensors
actors are in there because we can then Do

199
00:12:22.719 --> 00:12:26.719
<v Kevin Bauer>already earlier compliance checking, for
example, is this model compliant to fire

200
00:12:26.719 --> 00:12:27.799
<v Kevin Bauer>safety regulations?

201
00:12:28.159 --> 00:12:33.099
<v Kevin Bauer>And do we have what's, what's with the
sensors we can already do in advance, uh,

202
00:12:33.119 --> 00:12:36.719
<v Kevin Bauer>configuration of data points and the
billing automation control network.

203
00:12:36.780 --> 00:12:41.760
<v Kevin Bauer>We can configure in advance because, you
know, then in the construction phase, it

204
00:12:41.760 --> 00:12:47.239
<v Kevin Bauer>becomes crucial because we need to design
our digital in advance that then when we

205
00:12:47.239 --> 00:12:50.039
<v Kevin Bauer>come, get on the real side and we
constructed.

206
00:12:50.799 --> 00:12:53.000
<v Kevin Bauer>Then we want to constructive digital twin.

207
00:12:54.049 --> 00:12:59.830
<v Kevin Bauer>Based on the data from the digital twin
and therefore we need to really integrate

208
00:13:00.130 --> 00:13:04.000
<v Kevin Bauer>also the commissioning process so that at
the end, you know, somebody really checks

209
00:13:04.000 --> 00:13:10.090
<v Kevin Bauer>up all the data points, what we configure
also in the B model and let's say, is

210
00:13:10.090 --> 00:13:13.200
<v Kevin Bauer>everything there from a data, from an
operation data perspective, but also from a

211
00:13:13.200 --> 00:13:14.309
<v Kevin Bauer>geometrcal perspective.

212
00:13:14.809 --> 00:13:17.489
<v Kevin Bauer>And there what we did in this project in
Vienna and Open.

213
00:13:17.609 --> 00:13:23.950
<v Kevin Bauer>We integrated 3D scanning into the
complete construction process as its own process

214
00:13:23.950 --> 00:13:25.429
<v Kevin Bauer>or its own discipline.

215
00:13:26.049 --> 00:13:27.830
<v Kevin Bauer>Just to give an example, how do we do
this?

216
00:13:27.840 --> 00:13:33.570
<v Kevin Bauer>We did 18 3D scans in 3 phasesstructural
work, equipment phase is built phase

217
00:13:34.130 --> 00:13:39.630
<v Kevin Bauer>and for example, when the people were
finished in the works already the 2nd floor

218
00:13:39.770 --> 00:13:41.190
<v Kevin Bauer>and get the concrete work.

219
00:13:41.729 --> 00:13:46.409
<v Kevin Bauer>We scanned the first floor, and if they
have finished, uh, the, the mechanical

220
00:13:46.409 --> 00:13:48.880
<v Kevin Bauer>systems, then we scanned the mechanical
systems.

221
00:13:49.359 --> 00:13:54.869
<v Kevin Bauer>And at the end, we had a 3D scan, 3DS
built scan of the building, which we then use

222
00:13:54.869 --> 00:14:01.450
<v Kevin Bauer>to again adapt the B models to get really
full-fledged S built BI models, check

223
00:14:01.450 --> 00:14:04.729
<v Kevin Bauer>them, then also against the data points
that, you know, each data point, each

224
00:14:04.729 --> 00:14:09.409
<v Kevin Bauer>sensor, uh the humidity sensor, whatever
is in the B model has it right addresses.

225
00:14:10.260 --> 00:14:13.570
<v Kevin Bauer>Because, you know, this is crucial,
because if you didn't come to the operation

226
00:14:13.570 --> 00:14:16.940
<v Kevin Bauer>phase, imagine again, your big hospital,
you're really big.

227
00:14:17.099 --> 00:14:20.239
<v Kevin Bauer>You have a lot of sensors distributed over
the complete building.

228
00:14:20.580 --> 00:14:21.710
<v Kevin Bauer>This has to match.

229
00:14:22.140 --> 00:14:25.900
<v Kevin Bauer>Otherwise you will have a hard time
because, you know, if somebody closes the

230
00:14:25.900 --> 00:14:31.700
<v Kevin Bauer>suspended ceiling, nobody will do it again
afterwards because you know opening this

231
00:14:31.700 --> 00:14:34.340
<v Kevin Bauer>will be really costly.

232
00:14:34.460 --> 00:14:37.090
<v Kevin Bauer>So you need to do your homework in the
equation to digital.

233
00:14:38.460 --> 00:14:42.700
<v Jon Lester>No, what I really like about that is, you
know, you just discussed really quickly

234
00:14:42.700 --> 00:14:44.099
<v Jon Lester>quite a lot of different benefits.

235
00:14:44.179 --> 00:14:50.340
<v Jon Lester>Not only is it verifying the actual
delivery compared to the plan and

236
00:14:50.340 --> 00:14:54.900
<v Jon Lester>verifying the placement of different
equipment compared to the plan, but then also

237
00:14:54.900 --> 00:14:55.789
<v Jon Lester>using that to update.

238
00:14:55.859 --> 00:15:01.789
<v Jon Lester>So when you really walk out on handover
day, you have a BI model that is

239
00:15:02.349 --> 00:15:08.150
<v Jon Lester>is so accurate to what is reality and has
all the different equipments in it for

240
00:15:08.150 --> 00:15:12.909
<v Jon Lester>that use case that you just described, you
know, if, if, if I have a failure in a

241
00:15:12.909 --> 00:15:15.260
<v Jon Lester>sensor, I know exactly where it is.

242
00:15:15.349 --> 00:15:20.609
<v Jon Lester>I know exactly what it is, and if it's in
an operation room, if it's in a storeroom,

243
00:15:21.349 --> 00:15:24.429
<v Jon Lester>or if it's in a corridor, and this helps
me.

244
00:15:25.349 --> 00:15:30.000
<v Jon Lester>In that next phase, in this operational
phase, is that one of those core use cases

245
00:15:30.000 --> 00:15:34.440
<v Jon Lester>where we see when the preparation is done
correctly and when that planning is done

246
00:15:34.440 --> 00:15:38.830
<v Jon Lester>down to that level of detail, you really
start to cash in the benefits in that

247
00:15:38.830 --> 00:15:39.359
<v Jon Lester>operation phase.

248
00:15:40.869 --> 00:15:44.469
<v Kevin Bauer>Exactly, you know, if you have created
this digital twin in this detail, then you

249
00:15:44.469 --> 00:15:48.690
<v Kevin Bauer>have a really good billing documentation,
and you know, if you really know exactly

250
00:15:48.909 --> 00:15:53.150
<v Kevin Bauer>how you documented everything, then you
know it's also easy, much easier for you to

251
00:15:53.150 --> 00:15:57.190
<v Kevin Bauer>do a better operation because if something
breaks, you have an alarm somewhere, then

252
00:15:57.190 --> 00:15:59.750
<v Kevin Bauer>you can map the alarm to the real object.

253
00:16:00.390 --> 00:16:03.440
<v Kevin Bauer>And you know, then you really quickly can
identified as an alarm.

254
00:16:04.070 --> 00:16:04.719
<v Kevin Bauer>Where is it?

255
00:16:04.869 --> 00:16:08.549
<v Kevin Bauer>And then from this way from the B model, I
can deal as a life.

256
00:16:08.750 --> 00:16:13.789
<v Kevin Bauer>What's the priority you mentioned again,
your hospital as an alarm in an office room

257
00:16:13.789 --> 00:16:17.109
<v Kevin Bauer>is not a big problem, but alarm temper is
broke in the surgery room.

258
00:16:17.270 --> 00:16:18.460
<v Kevin Bauer>It's really important.

259
00:16:18.510 --> 00:16:21.630
<v Kevin Bauer>You have to solve it really quickly
because you know, there could be a loss of

260
00:16:21.630 --> 00:16:21.969
<v Kevin Bauer>pressure.

261
00:16:22.549 --> 00:16:24.479
<v Kevin Bauer>And you know, you could have a viral
infection through surgery.

262
00:16:25.719 --> 00:16:27.429
<v Kevin Bauer>And you know, exactly, you know this
priority.

263
00:16:28.099 --> 00:16:33.299
<v Kevin Bauer>And negative, you also exactly know where
as facility manager, where do I need to

264
00:16:33.299 --> 00:16:33.559
<v Kevin Bauer>go.

265
00:16:34.669 --> 00:16:39.890
<v Kevin Bauer>And how do I get there and which kind of
product I need to fix it in, in today's

266
00:16:39.890 --> 00:16:45.669
<v Kevin Bauer>world, yeah, it's a little bit of walking
around and um it's unfortunately really

267
00:16:45.669 --> 00:16:49.840
<v Kevin Bauer>efficient inefficient to identify that
with this spatial intelligence, we can

268
00:16:49.840 --> 00:16:53.190
<v Kevin Bauer>decrease the time needed to resolve alarm
up to 50%.

269
00:16:54.489 --> 00:16:57.780
<v Jon Lester>Which is huge, especially when you talk
about critical infrastructure like a

270
00:16:57.780 --> 00:17:02.640
<v Jon Lester>hospital that is also a huge site, a very
complex site with many different systems.

271
00:17:02.929 --> 00:17:09.380
<v Jon Lester>You know, this is exponential as far as
cost and consistency of operation if you can

272
00:17:09.380 --> 00:17:11.739
<v Jon Lester>achieve 50% saving every time you have an
error.

273
00:17:12.630 --> 00:17:14.270
<v Jon Lester>Um, Kevin, thank you so much.

274
00:17:14.790 --> 00:17:18.579
<v Jon Lester>We're going to have a lot more discussions
into detail on some of these topics

275
00:17:18.579 --> 00:17:22.430
<v Jon Lester>around every phase of this building and
then, and then also listening to some of the

276
00:17:22.430 --> 00:17:26.349
<v Jon Lester>experiences you had when you, when you
really got down into the, into the mud and

277
00:17:26.349 --> 00:17:26.969
<v Jon Lester>did this.

278
00:17:27.670 --> 00:17:29.109
<v Jon Lester>So I look forward to those.

279
00:17:30.180 --> 00:17:32.140
<v Jon Lester>At the very start, we talked about 3
things.

280
00:17:32.609 --> 00:17:37.420
<v Jon Lester>We talked about, you know, what a digital
twin is, why it's important for

281
00:17:37.420 --> 00:17:41.530
<v Jon Lester>operations, and, and some of the steps we
have to consider to get there.

282
00:17:43.260 --> 00:17:45.689
<v Jon Lester>The first one was, what's a digital twin?

283
00:17:45.729 --> 00:17:49.250
<v Jon Lester>Can you cover that quickly for us again,
uh, and, and then we'll skip through those

284
00:17:49.250 --> 00:17:52.329
<v Jon Lester>points quickly because I think they're
important for us for the next discussions as

285
00:17:52.329 --> 00:17:52.670
<v Jon Lester>well.

286
00:17:53.479 --> 00:17:57.739
<v Kevin Bauer>Yeah, you know, a digital twin is really
the combination of beam and sensor

287
00:17:57.739 --> 00:18:02.239
<v Kevin Bauer>technology to really enable them really
efficient building operations from an

288
00:18:02.239 --> 00:18:07.160
<v Kevin Bauer>energetical and uh technical operations
perspective to have really smooth billing

289
00:18:07.160 --> 00:18:07.359
<v Kevin Bauer>operations.

290
00:18:07.819 --> 00:18:10.250
<v Kevin Bauer>And the last important thing is how do we
get there?

291
00:18:10.500 --> 00:18:14.260
<v Kevin Bauer>It's really about also having a BI-based
design of a billing automation system, so

292
00:18:14.260 --> 00:18:17.780
<v Kevin Bauer>fire safety, security, billing automation
to come to the digital trend.

293
00:18:17.829 --> 00:18:17.900
<v Kevin Bauer>Yeah.

294
00:18:18.010 --> 00:18:19.239
<v Kevin Bauer>So this is really quickly said.

295
00:18:19.459 --> 00:18:20.800
<v Kevin Bauer>This is what I, what about, yeah.

296
00:18:21.180 --> 00:18:21.530
<v Jon Lester>I like it.

297
00:18:21.599 --> 00:18:22.260
<v Jon Lester>I like it a lot.

298
00:18:22.500 --> 00:18:26.140
<v Jon Lester>Kevin, thank you so much for your time
and, and for your expertise.

299
00:18:26.219 --> 00:18:29.119
<v Jon Lester>I look forward to the next conversations,
but thank you for the time today.

300
00:18:30.050 --> 00:18:30.500
<v Kevin Bauer>Thank you, John.

301
00:18:30.540 --> 00:18:31.859
<v Kevin Bauer>It was really a pleasure.

302
00:18:32.380 --> 00:18:32.880
<v Jon Lester>It's always good

303
00:18:32.880 --> 00:18:33.579
<v Kevin Bauer>looking forward to the next meeting.

304
00:18:34.500 --> 00:18:35.140
<v Jon Lester>Yeah, me as well.

305
00:18:35.219 --> 00:18:35.900
<v Jon Lester>I can't wait for that.

306
00:18:36.010 --> 00:18:38.630
<v Jon Lester>But, uh, but thank you so much and thank
you to everyone who's listening.

307
00:18:38.770 --> 00:18:41.520
<v Jon Lester>Please remember to comment, uh, share,
like this episode.

308
00:18:41.939 --> 00:18:46.359
<v Jon Lester>Subscribe to us whether you're watching on
YouTube or any of the other podcast, uh,

309
00:18:46.540 --> 00:18:50.180
<v Jon Lester>podcast platforms, and look out for the
new episodes and more episodes to come with

310
00:18:50.180 --> 00:18:50.459
<v Jon Lester>Kevin.

311
00:18:50.859 --> 00:18:55.699
<v Jon Lester>Where we're going to talk in real detail
about creating this digital twin, this

312
00:18:55.699 --> 00:18:59.939
<v Jon Lester>operational twin for a building, and some
of the considerations and learnings that

313
00:18:59.939 --> 00:19:01.500
<v Jon Lester>he had throughout the process.

314
00:19:01.579 --> 00:19:03.280
<v Jon Lester>So thank you again, and we'll see you
soon.

315
00:19:03.699 --> 00:19:04.079
<v Kevin Bauer>Thank you.
