WEBVTT
Language: en-US

1
00:00:10.670 --> 00:00:12.850
<v John Lester>Hi, welcome to Buildings of Tomorrow.

2
00:00:13.149 --> 00:00:16.389
<v John Lester>My name is John Lester, and today we're
focusing on the important topic of

3
00:00:16.389 --> 00:00:19.829
<v John Lester>hydronics, what it is and why it's so
important for us in the future.

4
00:00:20.180 --> 00:00:23.489
<v John Lester>Today I'm joined by Chris Copp, an HVAC
theory and hydronics expert.

5
00:00:24.110 --> 00:00:24.989
<v John Lester>Chris, welcome.

6
00:00:25.190 --> 00:00:25.510
<v John Lester>Welcome.

7
00:00:25.709 --> 00:00:26.540
<v John Lester>Thank you for joining us.

8
00:00:26.790 --> 00:00:28.260
<v Chris Copp>Thank you for having me here.

9
00:00:28.549 --> 00:00:29.569
<v John Lester>My absolute pleasure.

10
00:00:30.510 --> 00:00:34.090
<v John Lester>Let's start at the very beginning, Chris,
what is hydronics?

11
00:00:34.470 --> 00:00:34.830
<v Chris Copp>OK.

12
00:00:35.229 --> 00:00:41.270
<v Chris Copp>So when we talk about hydraulics, we have
to think about our infrastructure that we

13
00:00:41.270 --> 00:00:46.330
<v Chris Copp>have in the building to heat and cool and
ventilate and air condition the buildings.

14
00:00:46.790 --> 00:00:52.669
<v Chris Copp>And when we look at these technical
infrastructures, we can think about them as

15
00:00:52.669 --> 00:00:55.209
<v Chris Copp>being set up in 3 parts.

16
00:00:55.389 --> 00:00:58.509
<v Chris Copp>We have one part where we produce the heat
and cool.

17
00:00:59.080 --> 00:01:04.160
<v Chris Copp>And then we have to distribute that
throughout the building all the way out to the

18
00:01:04.160 --> 00:01:10.500
<v Chris Copp>consumers and When we need to move this
heat and cool from the production all the

19
00:01:10.500 --> 00:01:16.160
<v Chris Copp>way out to the consumers, we do that most
often by using water, warm water or cold

20
00:01:16.160 --> 00:01:16.639
<v Chris Copp>water.

21
00:01:17.099 --> 00:01:24.069
<v Chris Copp>To get the capacity out to the consumers
and the way this piping network where

22
00:01:24.069 --> 00:01:28.910
<v Chris Copp>the water runs in is set up, that's what
we call a hydraulic system or a hydraulic

23
00:01:28.910 --> 00:01:29.150
<v John Lester>setup.

24
00:01:29.300 --> 00:01:33.139
<v John Lester>OK, so through all of these large
buildings there is a piping network which takes

25
00:01:33.139 --> 00:01:35.970
<v John Lester>the heating or the cooling to the places
that people need it most.

26
00:01:36.269 --> 00:01:36.449
<v John Lester>Exactly.

27
00:01:36.709 --> 00:01:37.199
<v Chris Copp>OK,

28
00:01:37.339 --> 00:01:38.900
<v John Lester>and this is called the hydraulic system.

29
00:01:38.949 --> 00:01:40.910
<v Chris Copp>This is called an overall hydraulic
system.

30
00:01:40.989 --> 00:01:41.339
<v John Lester>OK.

31
00:01:41.589 --> 00:01:44.949
<v John Lester>And what are some of the parts that make
up a hydraulic system?

32
00:01:45.730 --> 00:01:49.550
<v Chris Copp>As I mentioned before, we look at this in
3 main parts.

33
00:01:51.260 --> 00:01:56.180
<v Chris Copp>Usually we start out at the consumer
because that's where we need to create.

34
00:01:56.870 --> 00:02:02.029
<v Chris Copp>The things for the users of the room so
that they feel comfortable, that they have

35
00:02:02.029 --> 00:02:09.009
<v Chris Copp>warm enough or cool enough, and then we
have to make sure that the Proper amount

36
00:02:09.190 --> 00:02:14.229
<v Chris Copp>of heating and cooling is delivered to
these consumers at any given time when we

37
00:02:14.229 --> 00:02:19.130
<v Chris Copp>operate the building, and this then goes
back to the main distribution which

38
00:02:19.389 --> 00:02:21.070
<v Chris Copp>generally assigns.

39
00:02:21.869 --> 00:02:26.990
<v Chris Copp>Certain amount of heating and cooling to
the different main parts of the building,

40
00:02:27.110 --> 00:02:32.470
<v Chris Copp>to zones and so on, and all the way back
to the production where we have boilers for

41
00:02:32.470 --> 00:02:38.149
<v Chris Copp>heating, where we have chiller plants to
create cold water to then make the building

42
00:02:38.149 --> 00:02:38.679
<v Chris Copp>comfortable.

43
00:02:38.809 --> 00:02:43.139
<v John Lester>OK, so these three parts of the hydronic
system, the consumers, where the people

44
00:02:43.139 --> 00:02:47.860
<v John Lester>are, the rooms, the houses, the places,
the distribution, the pipes through the

45
00:02:47.860 --> 00:02:50.509
<v John Lester>building, and the production, the boilers
that you mentioned.

46
00:02:51.160 --> 00:02:55.279
<v John Lester>All of these form this complete system,
and this is what we're talking about.

47
00:02:55.399 --> 00:03:00.039
<v John Lester>Obviously this is the delivery system, the
most important part of creating this

48
00:03:00.039 --> 00:03:01.309
<v John Lester>perfect environment for people.

49
00:03:01.479 --> 00:03:01.630
<v John Lester>Yes,

50
00:03:01.759 --> 00:03:07.479
<v Chris Copp>I think that's a very important part and
what we now want to do in this setup is

51
00:03:07.479 --> 00:03:14.199
<v Chris Copp>that we would like to match what we
produce with what is needed out there at any

52
00:03:14.199 --> 00:03:16.740
<v Chris Copp>given time when we operate such a
building.

53
00:03:17.029 --> 00:03:23.380
<v Chris Copp>And overall we call this demand based
control, so we would like to operate this

54
00:03:23.380 --> 00:03:28.500
<v Chris Copp>whole setup based on the demands of the
different consumers of the different rooms

55
00:03:28.500 --> 00:03:31.130
<v Chris Copp>or the different plants that need heating
or cooling.

56
00:03:31.220 --> 00:03:31.470
<v John Lester>OK.

57
00:03:31.570 --> 00:03:33.490
<v John Lester>And is this where the balancing comes into
it?

58
00:03:33.610 --> 00:03:37.220
<v John Lester>So to ensure that we don't make too much
and to make sure that we don't make too

59
00:03:37.220 --> 00:03:41.039
<v John Lester>little to make ourselves comfortable and
happy within our space.

60
00:03:41.229 --> 00:03:44.979
<v Chris Copp>When, when we talk about balancing, we
mean more.

61
00:03:45.369 --> 00:03:52.070
<v Chris Copp>That we make sure that The right amount of
nominal flow is assigned to the

62
00:03:52.070 --> 00:03:52.960
<v Chris Copp>different parts.

63
00:03:53.320 --> 00:03:58.240
<v Chris Copp>What we would like to achieve from a
controls perspective is that we control this

64
00:03:58.240 --> 00:04:05.110
<v Chris Copp>whole setup in a way that We match the
demand from all the different consumers more

65
00:04:05.110 --> 00:04:06.139
<v Chris Copp>or less exactly.

66
00:04:07.559 --> 00:04:12.750
<v Chris Copp>With what we produce and deliver through
the distribution and of course then

67
00:04:12.850 --> 00:04:19.709
<v Chris Copp>balancing to make sure everything is
equally balanced out is an important part, but

68
00:04:19.709 --> 00:04:24.720
<v Chris Copp>before we come to that we have to think
about then how should this hydraulic system

69
00:04:24.720 --> 00:04:28.619
<v Chris Copp>be built up, how do we really make the
piping.

70
00:04:29.019 --> 00:04:31.040
<v Chris Copp>So that we can adjust the capacity,

71
00:04:31.250 --> 00:04:32.059
<v John Lester>that's an important part.

72
00:04:32.220 --> 00:04:36.540
<v John Lester>So the hydraulic system is the delivery
part of of these buildings to ensure that we

73
00:04:36.540 --> 00:04:39.239
<v John Lester>stay warm and to ensure we stay cool when
we need to be.

74
00:04:39.630 --> 00:04:42.869
<v John Lester>And it's important for us because this is
where we spend our energy.

75
00:04:42.910 --> 00:04:44.540
<v John Lester>This is how we supply these contents.

76
00:04:44.790 --> 00:04:45.670
<v Chris Copp>Exactly perfect.

77
00:04:45.859 --> 00:04:51.750
<v Chris Copp>What we want to do is we don't want to
overspend, so we don't want to produce as

78
00:04:51.750 --> 00:04:56.540
<v Chris Copp>much as possible and then find out at the
consumers, oh, we don't need that.

79
00:04:56.859 --> 00:05:02.359
<v Chris Copp>We rather would like to just Prepare the
right amount of heating and cooling to

80
00:05:02.359 --> 00:05:08.399
<v Chris Copp>match the needs out there, and that's
where we have our proven building automation

81
00:05:08.399 --> 00:05:13.980
<v Chris Copp>functions that help us to achieve that,
but they heavily rely on the proper setup,

82
00:05:14.279 --> 00:05:16.200
<v Chris Copp>which is the hydraulic system.

83
00:05:16.399 --> 00:05:20.809
<v Chris Copp>It's kind of, you can think of it as kind
of the foundation for this whole system,

84
00:05:20.920 --> 00:05:25.440
<v Chris Copp>you know, and this has to be designed and
installed and set up properly.

85
00:05:25.545 --> 00:05:31.714
<v Chris Copp>Properly because only then can we reach
this goal to have demand-based control as we

86
00:05:31.714 --> 00:05:34.595
<v Chris Copp>call it, uh, in all operating conditions.

87
00:05:34.674 --> 00:05:36.065
<v John Lester>OK, so this is the foundation.

88
00:05:36.075 --> 00:05:39.554
<v John Lester>If we get this part right, then we have
the opportunity to be successful with the

89
00:05:39.554 --> 00:05:40.184
<v John Lester>rest of our things.

90
00:05:40.394 --> 00:05:40.695
<v John Lester>Exactly.

91
00:05:40.915 --> 00:05:41.364
<v John Lester>Perfect.

92
00:05:41.584 --> 00:05:42.665
<v John Lester>Thank you very much for your time.

93
00:05:42.795 --> 00:05:43.315
<v John Lester>My pleasure.

94
00:05:43.595 --> 00:05:46.375
<v John Lester>And thank you everybody for joining us on
Buildings of Tomorrow.

95
00:05:46.554 --> 00:05:50.625
<v John Lester>Feel free to like, share and comment and
subscribe here on this channel, and we'll

96
00:05:50.625 --> 00:05:51.515
<v John Lester>see you again shortly.