#124 The Delivery phase of a Smart Building

Buildings of Tomorrow ·

Show notes

In this episode on BIM and the Digital Twin, Jon Lester is joined by Kevin Bauer, Lead for BIM and Digital Twin at Siemens Smart Infrastructure. Together, they focus on the Delivery Phase of a Building. Tune in

Transcript

Hello and welcome to Buildings of Tomorrow. My name is Jon Lester, and in today's episode we're talking all about BIMM and the digital twin. We're going to focus today on the delivery phase of a building. So when we go through that idea planning, construction, and delivery phase, I'm joined today by Kevin Beau. He is the lead for BIM and digital twin for Sieming Smart-Infrastructure here in Europe. Kevin, thank you so much for joining us. Hi John, really happy to be here today. It's, it's an absolute pleasure, and it's, I'm excited to continue the discussion that we started a week or so ago around BM and the digital twin, and, and in that discussion we talked, you know, broadly across the whole, the whole conversation around, you know, why, why are digital twins so exciting, why are they so interesting for, for those of us that work in this building industry in the operation phase, but also through that construction phase. And we talked a lot about different values depending on that delivery phase or the operation phase or whatever it might be. Now today we're going to focus on the delivery phase, and, and let's start at the top. Let's call it from your perspective, what's so important and why is it so interesting for us to, to start this conversation and start to work around the digital twin already at the very beginning of a project? You know, a digital twin is all about data. And let's say when everything is about data, we need to really define and be clear on the topic, how we get this data, because all the values of digital twin promises like better technical billing operations, better energy management, or better space optimization. It's just possible if you get a really, really good digit digital twin, and a digital twin is, as I said, all about data, and we need to really plan how to get the data. Therefore, the delivery phase is really crucial. OK. And would it be fair enough to, to make a, you know, when we talk about a digital twin, we always talk about the virtual, the virtual replication of what happens in the real life. So we build a digital twin and then we build the real building. You know, for you that's gone through this process, and we'll dive in in a second into, into some of the real world experience you've had around this, does it really feel like building the digital twin when you go through this process in the correct manner? Um, um, yeah, when, I think it really depends on how you see it. It really, I think what's really important when you go through this process that we work all together, collaborative and based on some standardized frameworks and therefore, for example, you have this ISO 19,650. This is a really important and a really good standard from my point of, point of view, which defines the process of generation and managing data. We have been from the early phase, from the strategy phase of a building until the design or the construction under the operation. And one point which I want to highlight from the standard is that early phase, it's really important to define this asset information requirements. So the first step is really think about how you want to operate the building. And then if you have defined on how you want to operate the building, then you can define the use cases and Depending on the kind of building, let's say, for example, hospital, production plant, or if it's an office building, you have different use cases. And then you also have to define, uh, depending on the different, um, um, buildings, you then need different data because for example, in the hospital, asset tracking is a really important use case in the operational phase, and then you also need asset tracking sensors and you need to be sure that they're also in the BIAM model and you can combine the operation data with the BIM data. So this is, for example, the first step I would say which is really important. OK, perfect. I've done it to you again, you know, as soon as you start to mention standards, I remember that you're a certified building smart trainer, which, which is really important also. Because this is what drives that standardization and maybe my next question would be, you just mentioned how important it is to have that standard approach. How is this starting to look in our industry? Are you starting to see in your, in your other role, let's call it of training for building smart, are you starting to see more people from from different parts of our building industries doing this training and really upskilling themselves to deploy this BIM approach more effectively in the market? Yeah, yeah, we see the, uh, uh, a big wave coming, um, that more and more people really get standardized and this is really important, um, um, because, you know, at the end, it's every, everything is about knowledge, and it's if we bring more people on with the certification or specific level, it's much easier to have these topics because to really understand, um, why do we need to define use cases for the building operation early phase? Why is it important to also Yeah, integrate all the billing automation in a B project. Why is it important to have really built data and make them high qualitative and why is it important to, for example, to compliance checking? And having the certification, this basic knowledge, really helps to drive this forward. Yeah, perfect. Let's dive straight into the experience because, you know, this is something that you've lived, you've gone through the process in the real world on projects. Let's jump into that example and give us a bit of insight about, about the process and how it looks when you start at the very beginning and some of the things that you discovered along the way if we go, go into those, you know, some of those standardization topics. Yeah, cool. You know what, I can, let's say we can now talk a little bit about is, uh, our project in Vienna, the Aspen Technology Center 2. We have already finished this project 1.5 years ago where really, really, uh, is also a big R&D project, part of the Aspen Smart City research project, the biggest smart city project in Europe, and we really said. We want not to investigate how do you create such a digital twin and we really went through the complete chain in the early phase. We thought about this technology said is a startup incubator office. What kind of use cases are important for the operation phase, for example, flexible offices. Energy management is really important to be really, uh, uh, uh, energy neutral. And then if we have to, as we have to find them these use cases, then we went in the design phase and also talk about which kind of data do do we need? And then we identified really quickly. It's not just about having architectural beam and also mechanical, electrical and plumbing beam, but it was also really crucial to do also be models for the complete billing automation. So we A created models for the complete for all sensors. So all for the complete fire safety system, the complete security system, the complete automation system, the complete IT system. is also in the B model designed them. And also from this design of this building automation systems, we identified an early phase, some really interesting values. For example, we could do automatic compliance checking if the fire safety system is compliant to the regulation because it's really important, you know, if a fire breaks out, everything should be compliant and also that the data point and building automation control like configuration we could do in advance. No, perfect, because I think those values are really important. If we looked out into the market and we looked at 10 BIMM projects, I think we could confidently say today a majority of them are not done down to that level of detail with every device and every piece of those operational technology systems mapped within it. So you recognize some values also from that, not just some, some compliance checking, which is definitely important, especially when we talk about fire safety, but also engineering and design benefits and efficiencies for those building automation systems. How, like for you going through this process, was that a surprise, you know, were some of those benefits that you found along the way, you know, were they all things that you knew would come, or did you find more value than you expected through that process? Um, I think we even formed more value. It was really some, some things are really interesting. We didn't. We also didn't notice. Yeah, you know, it was also a new, a new project, the new project, but it's a complete new thing what we identified, for example, what we saw is was really interesting is we did complete a 3D scanning through the complete construction process. We did 18 3D scans to scan all the, the, the work. So we did 3 scans in the structural phase, 15 scans in the equipment phase, and 3 scans at the end when it was built and really integrated the scanning is an own discipline into the building process. So for example, when the people worked in the 2nd floor because the 1st floor was finished, we scan the 1st floor and then we identified that this scanning. Brings values to many different stakeholders, which we didn't know before. Yeah. For example, uh, the site supervision guy was really happy because he could look up if, if all the quantities are correct, if the contractors don't, uh, fool him, yeah. And then on the other side, the FM guys in the operation phase were also really happy having these 3D scans because they could use them to more efficient operated billing. And also the billing owner was really happy to have the 3D scans because he can use them online to, let's say, Um, if somebody, um, um, let's see if he wants to market the building, he just can't do this online via, uh, the web browser because it's really easy to use and in times of COVID, it's really complicated to meet people, we identified having, let's say this, this complete super good, uh, documentation is a big value and also for many stakeholders. You're right, and that's, I guess that's a really great example of, of what we spoke about at the start, where collaboration is such an essential part of this whole process and having the right people involved to help make really conscious decisions along the way also means that that those values that you get from the process can be, can be realized by all these different collaborators, and that's a really good example. How You know, after you went through this process and you did this 3D scanning as an example, and you got to, you, you know, you started to move through this delivery phase towards the end, um, how did this help you? finalized. Like how did this help you get to that end and have the confidence and, and have the information and the knowledge like you described before to, to take that step to finalize that delivery? Did, did that also bring additional value? Yeah, you know, I think what's really important to say we identified is having all these fire detectors, sensors, actors in the beam model, and then also enriching them and integrating them with the commissioning process, so we enriching them with the configuration data. Which enables them to the combination of the structural beam data with the operational data coming from the billing automation systems. So humidity, temperature, etc. As we have had done this really good. We then saved a lot of time in the commissioning phase via data data point mapping because we already had such good data. Each thermostat wasn't the be model. Each actctor each fire detector and they had. Their own IDs, so bucket IDs, multiple IDs, and then let's say as we, let's say, pushed on a button and turned on the, the, the billing automation system like you turn on a computer, everything fit together, and it was really surprising for us because it's without this good data, yeah, you need to do 3 rounds, map all the things again and again and again because, you know, nothing matches. But in this project, you know, we nearly everything matched them. Perfect. And this was really cool. Yeah, I was really happy. Yeah, I can imagine because that is really cool. That's kind of, that's what we're going for. It's that level of detail, that level of quality of data which is, which is more important than volume of data, of course, you know, enables you to do these things which, like you described, normally you go around 123 times. I think this is where in our industry we talk a lot about inefficiencies or we talk about processes that really aren't. Aren't, you know, evolving the way that they are in other industries. That's a great example, when we, when we have to go around 3 times and move stuff and drawings aren't complete, and stakeholder 1 works off a different set of drawings from stakeholder 2 and all these crazy things that we that we see BIM as the answer to, to, to find those efficiencies and make it real. Yeah, I fully agree to this, because, you know, as I said, uh, looking up this data, don't find it this, having that problem, you know, these are the, these are all the problems that we have in the construction industry, we have so many activities which are non-value adding. And it's where we need to go. What our clear target is. You know, we need to automate things and get rid of all this non-value adding activities because it's it, then we can do our work faster, quicker, with more quality. Have more fun and also more freedom probably. Oh yeah, yeah, I like it. All those things I'm excited about and it's, and what I love to see is that it's happening more and more within the industry and it's starting to happen, you know, and you know, the things that we imagine and we've been talking about for a long time because whenever we talk about BIMM, you know, we know it's not new, it's been around for a long time, but we really start to see it living its best life, let's call it, in projects like this. Kevin, thank you so much for joining us. It was a really great discussion. I'm, I'm looking forward to, to following up with another discussion in the near future where we start to look at the operation phase and we can really see how the building twin leverages all this data that you just described, this process that you went through on this project, to, to define and deliver those values that you described around space optimization and mechanical management and operation, etc. etc. I thought after this whole conversation and after this, this progress and the process that you and your team went through, if you had to boil it down into one or 2 or 3 key points. Um, if we're talking about the delivery phase, what would you say are the most interesting or important points or topics that you picked up through that experience that you would, that you'd highlight now for those listening? OK, yeah, I think you know, to get to a real digital twin, it's really crucial to integrate into the complete BMM design and construction process, also the complete billing automation. So we need to integrate the complete fire safety system, security system, automation, IT system. And make this, if you have planned it also integrate 3D scanning is its own documentation process to really come at the end to this, to this good pill data. And with this with this combination of really good beam and also 3D scanning, we then can dramatically increase on the one hand, the efficiency of the engineering and also the commissioning that the end we have really good data. We have to digital twin combining beam and IOT and building automation because this then just enables all the values. For example, technically, the more efficient technical building operations, more, more energy efficiency and also Better space efficiency. Yeah, I understand. Honestly, I think I'd love to have a discussion at some point in the near future just around the 3D scanning because, you know, I think in itself, as you described just there, making its own documentation discipline is a really interesting concept because there's different ways to do it, different approaches, but then as you described in your process, doing it. Um, Throughout the structural phase, throughout the equipment phase, and then in the as built, they all bring different information that can be useful for for different things. So, um, maybe we'll put this on the list, if that's OK with you to revisit and get a bit more detail as well. Yeah, we'd be really happy to do this. Yeah. Perfect. Then, thanks again, Kevin. Uh, your time is much appreciated. So thank you for joining us. Thank you for the time, John. It was really cool. It's, it's always good fun, so I very much appreciate it, and, uh, and I extend that thank you out to everyone who's listening to us here, whether you're, you know, you're on your favorite podcast platform, or you're streaming this wherever it might be, please remember to like, comment, and share. Subscribe to us so you can catch up with more conversations with Kevin around BIM and Digital Twin, but also other, other topics that we talk about every week. You should see. A new episodes. So make sure you do that. Reach out to us to say hello and ask for new topics, and also reach out and find Kevin, whether it's via LinkedIn or wherever it might be, to continue the conversation around BIM and the digital twin. So thank you to everyone and thank you again, Kevin, and we'll see you all soon. Cool, thank you.

Full transcript (WebVTT)