In the show, we have told you many things about Building Information Modeling (BIM). Wolfgang Hass is back with Jon Lester to talk about the different levels of the BIM database and why they are important to be implemented throughout the process. www.siemens.com/BIM
Transcript
Hello and welcome to Buildings of Tomorrow. My name is John Lester and in this episode we'll be talking about the different levels of the BIM database and why they're important for us to implement throughout the process. I'm joined in the studio today by Wolfgang Hass, a principal expert on the BIM topic. Wolfgang, thank you for joining me. Hello. So please give us some insight and explain the different levels of the BIM database. Yeah, there are different levels and uh. There are different dimensions, let's say, and maybe we should start with 2D drawings, for example, at the beginning. People are quite familiar with these 2D. These are flat drawings and uh you know, there are lines on the paper and there's a lot of interpretation because it's a missing third dimension and therefore we have 3D offshore and then we have to be careful because 3D, it's not just a. Model of lines which are going into the 3rd dimension. Now we are talking about objects and objects they have a dimension, so they have a coordinate where they're built in and they have a volume. So and this volume element it's called an object, yeah, and this 3D card is describing geo geometrics of these objects, but there are lots of other data here which are covered in these IFC standard, for example, other attributes which are belonging to this object. For concrete it's quite simple, yeah, because it's concrete and uh special type of concrete and there's a manufacturer and so on, but. In the same way products are described, for example, a controller or an HMI, a room unit, and so on, and there's functionality behind it, and that's also covered as an attribute to these objects in 3D, in 3D. So it's a geometrical information and there are additional information belonging to this object to this product. OK. And is this a general position where we are today? Yes, that's where we are today. There is still the um the stamping of plans to get the allowance to build in many countries still stamped on 2Ds here, so they didn't make the progress to stamp 3D plans. So a physical piece of paper, rubber stamping and you got this permit. To be allowed to build, but there are other countries where we made a little bit more progress where the electronic way is also allowed. So it's an electronic stamping, and that's based on the 3D model. So that's the future for the other countries too. OK. And from the 3D. Model, what are the next steps? Then it sounds a little bit strange because we have 4D, so we have the fourth dimension there built in, but it's not so difficult. It's just the time schedule. It's a combination of these 3D plans combined with the scheduler. So in many of the 2 day solutions, it's a combination of the cutT system combined with Microsoft Project, for example. So you can see how the building is built or is growing via a slider. So you can position the slider on a date and you can see how the building should look like at that stage. It's very important to have the scheduler just to check the physical construction, whether they are according to the plans. So that's 4D. So that's the time factor, and this is. This is for people who are involved in the construction phase to understand where they are and where they should be throughout the construction process, and it's also very important to see which, for example, transport ways are necessary at which stage. You see what's already built. Is the crane still there or it's already removed? Is the door built in or not? Can I pass it with these widths or Of material, so it's very important for the construction phase to know what's there at which stage time wise to perfectly understand what is at any point in time what is actually being installed and it's also very important for the checking for the controlling whether you have delayed something because usually this has an influence when when something is delayed, you have problems later on because you have no chance to bring the material to the place or. Yeah, whatever, whatever happens, yeah, so it's the, uh, time wise, uh, controlling. So that's very important and it works, uh, I have to say quite well on sites. Yeah, that's a combination of these graphical information with the time scale the time scale, and I have to ask, is there another level? Yes, there is 5D. Imagine that, yeah, it's 5D and 5D is now covering also the cost situation. And it's the same time as a slider and you can see how much costs are or how much money is already spent and how much is still available. So it's similar to the progress in the construction to the 40 you can see the. Uh, financial situation in each stage, but there it's a little bit more complicated because, uh there you need to have links to the SRP system, so, uh, other systems, and the booking is normally not in real time, so there is maybe a little bit of delay and so it's not as accurate as the time scheduler, but I think the. Specific industries are working on this to have a better overview of what's really spent, when and how much money is available and I guess more transparency on, on exactly that, how many things may have been completed physically through the schedule but not yet billed or passed through to the these will also be quite interesting for payments, for example, for billing and so on, yeah, so financial transparency, I think it's very important. And but there's, I think it's still a little bit space to make improvements, so we made the first steps there. It's working, but it could be better and hopefully not to find the difference between actual money spent and scheduled money spent, hopefully not, but in general that's part of the BIM approach. Yes, you will get much more transparency in all cases. Yeah, transparency, I think that's one of the keys, the key for BIM, OK. This is 5D 6D. Yeah, now we can start a little bit more with a fantasy. So there are different interpretations, but 6D, 1 interpretation is the management station or the window to the processes. It's a common window to all the data. Uh, which are somewhere in this digital twin in this virtual model, so it's a common management station, the window to the process to data, and so on. So it's a really under every day, exactly, and it's not so much discipline specific, it's the overall picture or the overall view to the to the building, and that's usually 60. And some are coming up with 70, 80, uh, but I think that's not, this is, this is still a dream. It's, it's a little bit, yeah. OK, perfect. Thank you very much for your time. And thank you all for joining us on Buildings of Tomorrow, please like, share or comment on this episode and subscribe to us here on this channel. We'll see you again soon.